Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED EBOM Eligibility

EBOM-2009 PIf1:Minimum Program Requirements
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Wed Dec 30, 2015, 5:38 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

Industry definition of interconnecting stair?

Pilot-Credits EQpc78:Design for active occupants
posted by  Joanna Switzer  on 

Is anyone aware of a formal definition for this term? I was unsuccessful locating a reliable / official one. Thx!

0

Main entrance and LEED Project Boundary for Future Expansion

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Lourdes Salinas  on 

Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary.

1
Fri Nov 27, 2015, 2:30 pm

Meeting parking requirements for residential spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.

1
Fri Nov 27, 2015, 4:43 am

Appendix A envelope U-values in retrofit projects

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We are doing a project which is being 10% retrofitted. The reviewer wants us to used the envelope values before retrofitting as baseline and the new envelope properties as the proposed project.

1
Wed Aug 26, 2015, 8:17 pm

Move-in versus construction

LEED Rating System Selection
posted by  Mark Donahue  on 

Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?

1
Wed Aug 26, 2015, 9:35 pm

Water meter broke down during performance period

EBOM-2009 WEc1:Water Performance Measurement
posted by  Shakir Ismail  on 

We are working on a project where the building meter is owned by the utility authority.

1
Thu Aug 27, 2015, 2:58 am

62MZ calc for critical zones

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Indochine Engineering VN  on 

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.

0

HVAC duct insulation adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Gaura Saxena  on 

Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe

1
Tue Sep 1, 2015, 12:17 am