Fiberglass Wall Panels - GreenGuard Select Education, Healthcare
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
We have Crane Fiberglass wall panels at janitor closets; I assume they should be included for this credit as a 'wall covering'. The product has certifications for Greenguard Select Education and Gr
Training operating personnel training verirfication
CI-2009 EAc2:Enhanced Commissioningposted by Karina Hanyzewski on
Hi there!, I have a question regarding this requirement for EA Enhanced Cx. The Tenant is pursuing a LEED CI certification in a non-LEED Shell bldg.
LEED CS 2009 SSc4.3 - Option 1 Preferred Parking
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Ruel Galve on
We have a mixed use development project in Jakarta with 6 basements.
Issue with credit 4 calculator EAC4_DYA
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mehdi Kardehi on
Hi All, I am very new to LEED and trying to apply for it for a project we have in hand.
SRI Value for concerete
NC-2009 SSc7.2:Heat Island Effect—Roofposted by soha yamani on
Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part
commissioning vs phasing out construction
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catharina B on
Hello We are working on the project, which include 2 independent buildings: A & B (each 7 stories above grade has own mechanic, energy system and entrances ) and 1 floors underground parking sp
RPc Threshold Questions
NC-2009 RPc1:Regional Priorityposted by Daya Apunte on
I want to make sure that I am understanding the thresholds for a few different RPcs. For three of the possible credits, there is a threshold given in the v2009 RPc database.
Oversized fan reduce fan energy use
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
Based on the App G fan curve, if we have a oversized VAV supply fan, the power usage will be lower than a properly sized fan. For example, need 5k cfm a 10k cfm fan operate at 0.5 load, correspondi
Path2 - ventilation to begin 3 hours prior to occupancy
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Mehdi Kardehi on
Our project is a resort with number of guest rooms, spas, restaurants , etc We are going with path 2 but there is a sentence under path 2 saying " During each day of the flush out period , ventilat
What constitutes a building entrance?
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Carolyn Day on
We are working on a tenant fit-up on the 8th floor of a downtown building which sits on a corner. The first floor has several retail establishments with direct street access.