Forum quick links
Fueling Capacity - multiple stations
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Garrett Ferguson on
In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord.
Where to draw the line on food purchasing
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Haley Duncan on
Our food purchases are spread across several people and purposes.
Does restaurant dishwashers qualify as waste water?
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Kristopher Lashley on
I am wondering if I can include a restaurant dishwasher in my waste water calculations for WEc2? According to the reference guide waste water is defined as "the spent or used water from a home, co
Baseline heating set-point when no heating system exists
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
According to ASHRAE 90.1 (2007) Table G3.1 - 10 c, "where no heating systems exist, HVAC system shall be assumed to be electric".
FSC Wood COC
NC-2009 MRc7:Certified Woodposted by Andy Prestridge on
We have received the FSC invoice for some of our FSC plywood and our subcontractor had it delivered to his shop a few miles away and then brought it to the site.
Tenants Obliged to Share Data with USGBC?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ian McCall on
Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?
Occupant Survey
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Teresa Farmer on
our project is a manufacturing plant. Do we conduct the occupant survey among the office employees or among the entire workforce as most of the employees are in the mfg portion of the building
Custodial Effectiveness Assessment
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Teresa Farmer on
our project is a manufacturing plant. Should we conduct the custodial effectiveness assessment in the office area or in the entire facility.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-Site Renewable Energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
Open space definition
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.