Forum quick links
AHRAE90.1- LIGHTING POWER DENSITY
posted by Ghaleb El Mheirat on
We are curreinlty designing a building targeeting to be LEED certified under version 3.0, As per ASHRAE 90.1:2007 requirements for LPD is mandatory, in which luminare wattage is defined as follow:
ASHRAE 90.1- LIGHTING POWER DENSITY SOFTWARE.
NC-2009 EAp2:Minimum Energy Performanceposted by Ghaleb El Mheirat on
We are currenlty in the design process of a building targetting to be LEED certified under version 3.0.
Can We Use Both Facility and Site Rates?
NC-2009 MRc2:Construction Waste Managementposted by Sara Zoumbaris on
Hi all, I am working on a project that ended up using 2 separate waste haulers during the time of the project - one for the first half or so, and the second for the remainder of the project.
FSC & aluminum wood clad windows total $$ cost for wood budget
NC-2009 MRc7:Certified Woodposted by Mike Stopka on
Hello - We are using a very expensive aluminum wood clad window system for a project. My question is, how does this window system factor into the total wood budget $$ amount.
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Terraces
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Mike D on
The building has a few terraces on different roof levels of different floors. Do terraces count as open space? They will be accessible
Special Circumstances or Alternative Compliance for SSc1
NC-2009 SSc1:Site Selectionposted by Lawrence Lile on
We've got a building and hardscape located more than 50 feet from a navagable body of water, with one exception. There is a paved road to a dock that is on the body of water.
EA advanced Energy metering credit (LEED v4)
NC-2009 EAp2:Minimum Energy Performanceposted by Angelina Ten on
Dear all, Currently I have a project where energy meters comply with all the corresponding credit requirements except that they do not display energy demand.
Occupancy hours vs. Building Operating Plan
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Anna Korinkova on
My question is regarding to operating hours of the building and the Building Operating Plan (BOP).
outdoor air flow monitoring location
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Lily Li on
FOR DOAS unit, can the outdoor air flow monitoring located in supply air side?