Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Facilities off-site alllowed but cannot be double counted

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Nate Tsang  on 

Hello, I am currently working on a project and we are targeting LEED ND. As part of LEED ND, one of the buildings will be LEED NC certified.

1
Wed Mar 16, 2016, 7:17 pm

Dilution Systems for Multi-use building

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  Haley Duncan  on 

Hi, our project includes a winery production area and has different cleaning protocols then our office and tasting room spaces do. Does the dilution requirement apply to these types of spaces?

1
Mon Nov 30, 2015, 8:19 pm

Energy Star minimum area = 5,000sf

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Saul Pichardo, AIA  on 

I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.

1
Tue Apr 7, 2015, 3:59 pm

Option 1. EPD Question

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Kai Starn  on 

Hello all, In doing some research it is easy to find manufacturers that provide Product-specific Type 3 EPDs (valued as a 1.0 pts.) Such examples of manufacturers that already have such EPDs incl

1
Mon Dec 21, 2015, 3:07 pm

Sample LEED 2009 Basis of Design Document

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Robert Shields  on 

I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.

1
Tue Apr 7, 2015, 3:46 pm

How to calculate area of edible nut- and fruit-bearing plants?

Pilot-Credits SSpc82:Local food production
posted by  Noriko Nagazumi  on 

Is there any guidance on how to calculate the area of edible nut and fruit bearing trees? I assume we could calculate the area based on the position of the tree trunks or the tree crown.

1
Tue Jun 18, 2019, 5:52 pm

Project on Hold

General forums
posted by  Nereyda Rodriguez  on 

Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.

1
Tue Apr 14, 2015, 4:02 pm

C&S 2009 Retail tenant space

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  London Huenefeld  on 

I am working on a C&S project in which most of the tenants are retail stores.

1
Tue Sep 20, 2016, 4:11 pm

Pressure drop adjustment factor with DOAS System

CS-2009 EAc1:Optimize Energy Performance
posted by  Curtis Clark  on 

In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.

1
Thu Apr 9, 2015, 2:51 pm

MR c7 forms

NC-2009 MRc7:Certified Wood
posted by  Mark Ramsey  on 

As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.

1
Mon Apr 13, 2015, 3:04 pm