LEED EQ 4.2 Wallpaper Compliance

General forums
posted by  Saahiti Penigalapati  on 

One of the credits we are attempting on a LEED project is the EQ 4.2 (Low Emitting Materials-Paints and coatings).

1
Wed Apr 1, 2015, 12:08 pm

management plan update after preliminary review

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Noriko Nagazumi  on 

We received a comment to revise our management plan on the preliminary review. Should we update the date of the plan? The date would come after the performance period...

1
Mon Jan 4, 2016, 9:30 pm

Commissioning Requirements Off-site

Credit Forums
posted by  Alicia Villanueva  on 

Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.

0

2009 calculator - "private" bathrooms in a commecial facility

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Jessica Hawley  on 

I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.

1
Sun Mar 22, 2015, 10:51 am

Project Sites within a LEED ND Boundary

General forums
posted by  Philippa Cameron  on 

There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss

0

CORE area and SHELL area

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Yodi Danusastro  on 

How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.

1
Mon Mar 30, 2015, 1:17 am

Baseline for Blow-out Fixtures

CS-2009 WEp1:Water Use Reduction
posted by  study topenergy  on 

According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.

1
Mon Nov 30, 2015, 10:53 pm

Non recyclables in recycling stream

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Vanessa Seibert  on 

I think I know the answer but just want to double check.

1
Tue Mar 24, 2015, 8:04 pm

Parking space ownership

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gustavo De las Heras Izquierdo  on 

I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?

1
Thu Mar 26, 2015, 1:10 am

Parking spaces owned

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gustavo De las Heras Izquierdo  on 

I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual buyers?

0