Forum quick links
LEED Core&Shell?
posted by Lise Dannesboe on
Hi! Our building is a renovation project in which the developer does a total refurbishment of building base systems and building shell. The building is mainly office building, a small part appr.
EAc2.3 - Ongoing Cx forms
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Alexis Voeltner on
Hi Hannah, do you have an example of what the on-going commissioning test form should look like?
Ceramic wall tile adhesives and grouts
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nelina Loiselle on
Hello, This may seem like a stupid question, but I am working on a project that has porcelain wall tile being installed in bathrooms and I'm not sure how this is supposed to be listed under IEQc4.
What does LEED consider as Sitework?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Erika Duran on
Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.
Natural ventilation for residential
CS-2009 IEQp1:Minimum IAQ Performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Entering nonregularrly occuoied spaces in IEQp1 calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
Solid quartz flooring
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by CT G on
We are working on a project where the owner would like to install solid quartz flooring (i.e. Silestone: http://content.cosentino.com/docs/silestone/MSDS-Silestone-EN.pdf).
What Rating System to use
posted by Carlos Leignadier on
Hi, We are currently working on certifying a mall with the Core and Shell V2009 rating system.
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
require future tenant?
CS-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Courtney Royal on
Do you need to require, or include in sales agreement, the future tenant to report their energy and water usage?