Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Private vs. Public

NC-v4 WEp2:Indoor water use reduction
posted by  Lorne Mlotek  on 

why do a private lavoratory faucet have a higher rate than a public under the EPAct 2.2 vs 0.5?

1
Wed Apr 1, 2015, 9:21 pm

ANY PRESENTATIONS DONE FOR NEW LEED FOR HOSPITALITY?

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  robert feduik  on 

I'm asked to give a talk on LEED for Hospitality...was wondering if there are any good PPT presentations that might be available?

1
Sun Apr 10, 2016, 4:55 pm

Solid Surfacing Materials in LEED v4

NC-v4 EQc2:Low emitting materials
posted by  Amit Ahiel  on 

Are solid surfacing materials considered in this credit under furniture?

1
Sun Jan 11, 2015, 4:27 pm

CWM - Temporary Landfill

NC-2009 MRc2:Construction Waste Management
posted by  ethen mcmanus  on 

The entire purpose of MR2 is to divert waste from landfills, and the waste should be either recycled, donated, salvaged or reused. My question is as follows: My project is in a third world countr

1
Mon Jan 12, 2015, 3:20 pm

EAp2 Domestic Hot Water Pump sizing

NC-2009 EAp2:Minimum Energy Performance
posted by  MKK LEED  on 

Hello, Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding system in

1
Tue Jan 13, 2015, 3:24 pm

Existing building, physically sepatated from new construction

NC-2009 PIf2:Project Summary Details
posted by  FABIO VIERO  on 

We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.

1
Mon Jan 19, 2015, 7:15 pm

Polishing Powder

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Omar Elrawy  on 

Dear all, I have a polishing powder that is intended to be used for polishing marble surface.

1
Wed Jan 14, 2015, 2:06 am

Deadline for Appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Marcio Alberto Casado Pereira  on 

Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.

1
Tue Jan 13, 2015, 2:57 pm

We are in the process of

EBOM-v4 WEp1:Indoor water use reduction
posted by  LEED Pro Consultant  on 

We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.

1
Tue Jan 17, 2017, 6:15 pm

Cold C&S - No HVAC

CS-2009 EAc1:Optimize Energy Performance
posted by  Scott Johnson  on 

We have a project that consists of a cold core and shell that will have warm lobby.

1
Sat Jan 17, 2015, 7:34 pm