Forum quick links
Option 3 - Measurement
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Ashonta Langdon on
Is the minimum foot candles for CI 10 or 25?
Lighting Controls in Jewelry Store
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Luke Wild on
We are working on a LEED project for a jewelry store which has millwork with lighting in it all around the store.
Multi-Purpose Latex Primer/Sealer
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Stephanie Santiago on
What voc limit would I use for a Multi-Purpose Latex Primer/Sealer paint for use on interior ladders?
Non regulated items (residential light & receptacle loads)
NC-2009 EAp2:Minimum Energy Performanceposted by Abena Darden on
We are looking at an energy model report for a Residential tower. The project was initially achieving 12% savings.
Number of bus stops and bus lines required
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sarah Lavalliere on
There seem to be a slight difference in the wording between the English version of the LEED 2009 CS Canada reference guide and its French translation.
MRc4 Recycled content
CI-2009 MRc4:Recycled Contentposted by Lorissa Kimm on
How does one count the recycled content of fabrics used in furnishings? Do you have to separate out the cost of the fabric relative to the cost of the chair?
Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Modeling pump, fan, COP
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.
Attachments for the Resubmission
posted by kelly ryan on
I am resubmitting a credit in response to LEED comments from the intial submission. The attachment file has been updated.
Different HVAC system in baseline than proposed design- C&S
CS-2009 EAc1:Optimize Energy Performanceposted by Ron Dean on
I am doing the energy model for a CS project.