Urban agriculture in high density, zero lot line project.
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Nadia Ayala on
Hi everyone, I have a project in Mexico where we are trying to create a rooftop food garden.
LEED AP - Experience required
posted by Rita Barata on
Is the Estidama experience valid as LEED experience for the LEED AP exam?
Documentation if the building structure remains the same
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nicole Isk on
We have a Major Renovation project where NO changes on the building structure will occur.
Data center - Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus and all coleagues, In the Data center I'm about to start modeling, there are 4 IP rooms. Each of these rooms has IP load with a power density of 3.2 kW/m2 or 297 W/ft2.
Flushing toilets with drilled corrosive non potable water
NC-2009 WEc3:Water Use Reductionposted by Viktor Reutherborg on
We have an adjacent property (with the same owner) that has to remove non potable water from its foundation. This groundwater flows in a large part from our property.
Engineered ventilation rates
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEEDme Lorenzi on
We are working on a office building in which there is an openspace. The outside openings largely cover 4% of the total floor area.
Data Center Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus, Thanks for your reply. I've been trying to undestand the explanation of 90.1-2013 User's Manual, page G-35.
Rainwater from roof
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Viktor Reutherborg on
Hi, Question one. We are in a semi-arid watershed. In the calculations, we count on 0,75 inch rainfall during 24 hours? We are planning to clean the rainwater from the roof.
DATA Center
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Markus, thanks again. Since the English is not my mother tonge, sometimes I'm geting confused by enterpreting some explanation although I'm already 37 years in the HVAC branch.
Updated documentation and resubmittal in construction phase
posted by Emmanuel Pauwels on
Our project is going to submit for Construction Review for a BD+C project. We applied a split review. Design Credits are approved. During Construction some room dimensions changed.