Forum quick links
Verification of pressure difference
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Francisco Aguirre on
Hi all, We are developing a NC Campus project located in the Arab Gulf.
Cellulose Insulation and CA 01350
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Allison Zuchman on
I have found manufacturer documentation for all materials on a school project required to meet IEQ4.6 except for one product, a cellulose insulation (ICC Celbar).
Table EAp2-5
NC-2009 EAp2:Minimum Energy Performanceposted by Isabel Santos on
Dear all, I am having one difficulty in filling the form of EAp2.
Tenant's Project Scope
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sunayana Jain on
I have a small office fit-out which is served by a 5 RTUs exclusively. In the tenant's scope of work is only the ductwork and lighting with lighting controls.
SSc9.2 Defining "Direct Exterior Access"
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by Daniel Herstine on
We have patient courtyards that serve four (4) patient units each.
what defines a roof for this credit?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
What defines a roof for this credit? Is it slope, construction, or function? I have a project with a mansard roof. It has a 65% slope, very steep.
Path 9
CI-2009 SSc1:Site Selectionposted by Mike D on
Hello, If attempting Path 9, do the fixtures of the tenant space need to be included as well or do just the ones in the base build need to be included? Many thanks!
how many plants in an industry-wide EPD?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Martha VanGeem on
How many plants have to be included in an industry wide EPD?
Thermal Comfort Controls
NC-v4 EQc5:Thermal comfortposted by Jenelle Shapiro on
If the project is meeting Thermal Comfort Design (ASHRAE 55) via zoned heating but without AC (temperate climate zone)...
Vineyards?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Kevin Gilleran on
Can vineyards within the LEED boundary for a winery project be counted in the vegetated open space area calculations?