Primary Secondary Pumping Power

CS-2009 EAp2:Minimum Energy Performance
posted by  Matt Humphreys  on 

When modeling a project that has a baseline building requiring system #8, the system cooling tonnage is > 600 tons therefore G3.1.3.10.

1
Fri Dec 6, 2013, 6:56 pm

Banking branch: LEED for Retail NC or CI?

LEED Rating System Selection
posted by  Silvia Ruiz  on 

Hi, This is the issue: the banking branch in question will be located in a new shopping center.

1
Tue Dec 10, 2013, 5:34 pm

Calculation of the required area

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Magda Aghababyan  on 

Dear all, We are doing a project with an IT office complex. The largest possible waste stream is E-Waste, food and paper. We do not see much potential for glass and metal waste streams.

1
Fri Dec 20, 2013, 8:41 pm

MPR2 Defining 'one building'

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Mark Frey  on 

The building to be certified is an office, hotel and retail complex and is composed of two seperate buildings. There are no structural connections between the buildings above ground.

1
Tue Dec 10, 2013, 1:28 pm

multi-use residential building, usage groups?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Courtney Royal  on 

The project is a residential building, but also has a small recreation space in cellar and a small retail space and gym on ground floor, how should the usage groups be defined?

1
Fri Dec 20, 2013, 9:46 pm

LEED NC or CI?

LEED Rating System Selection
posted by  Catherine Maxemchuk  on 

We are working on a project, renovation of an existing 3 story building in an urban area.

1
Tue Dec 10, 2013, 5:32 pm

Recycle area with mezzanine

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Gabriela Hernández Castillo  on 

Hello, we are locating our recycling area at the underground parking lot.

1
Fri Dec 20, 2013, 11:02 pm

IEQp1 LEED Online form what to input?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Kasandra Martin  on 

For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.

1
Fri Dec 20, 2013, 11:30 pm

Landscaped park across from project building

NC-2009 WEc1:Water Efficient Landscaping
posted by  Alfred Servodidio  on 

Our project is an historic building in downtown NYC. The owners of the building are contributing to the restoration of the small park directly across the street from the building.

1
Wed Dec 11, 2013, 5:35 pm

High performing existing baseline building.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Steven Beccia  on 

Hello All, I am looking to get some clarification or consensus regarding modeling the baseline HVAC systems for EAc1.3. My specific scenario is that we have a core and shell building, under const

1
Tue Dec 31, 2013, 4:31 pm