Primary Secondary Pumping Power
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
When modeling a project that has a baseline building requiring system #8, the system cooling tonnage is > 600 tons therefore G3.1.3.10.
Banking branch: LEED for Retail NC or CI?
posted by Silvia Ruiz on
Hi, This is the issue: the banking branch in question will be located in a new shopping center.
Calculation of the required area
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Magda Aghababyan on
Dear all, We are doing a project with an IT office complex. The largest possible waste stream is E-Waste, food and paper. We do not see much potential for glass and metal waste streams.
MPR2 Defining 'one building'
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Mark Frey on
The building to be certified is an office, hotel and retail complex and is composed of two seperate buildings. There are no structural connections between the buildings above ground.
multi-use residential building, usage groups?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Courtney Royal on
The project is a residential building, but also has a small recreation space in cellar and a small retail space and gym on ground floor, how should the usage groups be defined?
LEED NC or CI?
posted by Catherine Maxemchuk on
We are working on a project, renovation of an existing 3 story building in an urban area.
Recycle area with mezzanine
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Gabriela Hernández Castillo on
Hello, we are locating our recycling area at the underground parking lot.
IEQp1 LEED Online form what to input?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.
Landscaped park across from project building
NC-2009 WEc1:Water Efficient Landscapingposted by Alfred Servodidio on
Our project is an historic building in downtown NYC. The owners of the building are contributing to the restoration of the small park directly across the street from the building.
High performing existing baseline building.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Steven Beccia on
Hello All, I am looking to get some clarification or consensus regarding modeling the baseline HVAC systems for EAc1.3. My specific scenario is that we have a core and shell building, under const