Demolished Concrete to be reused as fill for MRc4

NC-2009 MRc4:Recycled Content
posted by  Greengrade User  on 

We are currently working on a multiphase development in which the foundation of one building is being completed while another is being demolished.

1
Wed Nov 6, 2013, 1:30 am

Manufactured units

NC-2009 IDc1:Innovation in Design
posted by  Kath Williams  on 

As a project design team interviews manufacturers about providing sustainable, stackable housing units, could a comprehensive focus on their process as well as product garner an innovation point?

1
Wed Nov 6, 2013, 3:35 pm

pre-development / post-development

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Doreen Kruschina  on 

Sorry, might be a stupid question: in our case the pre-development is a demolished building complex. Do we calculate the post-development against the previous development or the undeveloped condit

1
Wed Nov 6, 2013, 5:01 pm

Precertification requirements

CS-2009 EAp2:Minimum Energy Performance
posted by  František Bartoš  on 

Hi, is there some document that specifies precertification requirements for EAp2 (eventually for all prerequisites and credits in LEED CS 2009)? Thnaks for advice. Frank

1
Wed Nov 6, 2013, 5:54 pm

Homeless Shelter patrons FTE vs Residential classification

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maria Fiorelli  on 

We are running preliminary water calculations to verify that we meet the WEp1 requirements. The project will have 2 usage groups, the homeless patrons and the staff.

1
Thu Nov 7, 2013, 1:33 am

Sample Templates not working

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Kathleen Gaffney  on 

Has anyone else noticed that the sample template downloads isn't working. The page is blank? Neither the link from here or directly from LEED Online.

1
Wed Nov 6, 2013, 7:57 pm

Hot Water Energy Consumption in big buildings

CS-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Good evening, I have a question regarding a situation that I have encountered in more than one project: Suppose that for a big shopping mall there is a hot water demand for fast food areas and sh

1
Wed Nov 6, 2013, 8:34 pm

What LEED system to use

LEED Rating System Selection
posted by  Camala Jones  on 

We are investigating the possibility of some renovation work. At the smallest it would be a connector from a second story walkway/hall over to an existing escalator platform.

1
Fri Nov 15, 2013, 3:25 pm

Type and sub-type area matrix IEQ EBOM

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Hector Miranda  on 

I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?

1
Fri Dec 20, 2013, 5:55 pm

Cork FSC certified?

NC-2009 MRc7:Certified Wood
posted by  Mario Pinoli  on 

Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider

1
Thu Nov 7, 2013, 3:22 pm