Demolished Concrete to be reused as fill for MRc4
NC-2009 MRc4:Recycled Contentposted by Greengrade User on
We are currently working on a multiphase development in which the foundation of one building is being completed while another is being demolished.
Manufactured units
NC-2009 IDc1:Innovation in Designposted by Kath Williams on
As a project design team interviews manufacturers about providing sustainable, stackable housing units, could a comprehensive focus on their process as well as product garner an innovation point?
pre-development / post-development
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Doreen Kruschina on
Sorry, might be a stupid question: in our case the pre-development is a demolished building complex. Do we calculate the post-development against the previous development or the undeveloped condit
Precertification requirements
CS-2009 EAp2:Minimum Energy Performanceposted by František Bartoš on
Hi, is there some document that specifies precertification requirements for EAp2 (eventually for all prerequisites and credits in LEED CS 2009)? Thnaks for advice. Frank
Homeless Shelter patrons FTE vs Residential classification
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Fiorelli on
We are running preliminary water calculations to verify that we meet the WEp1 requirements. The project will have 2 usage groups, the homeless patrons and the staff.
Sample Templates not working
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kathleen Gaffney on
Has anyone else noticed that the sample template downloads isn't working. The page is blank? Neither the link from here or directly from LEED Online.
Hot Water Energy Consumption in big buildings
CS-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Good evening, I have a question regarding a situation that I have encountered in more than one project: Suppose that for a big shopping mall there is a hot water demand for fast food areas and sh
What LEED system to use
posted by Camala Jones on
We are investigating the possibility of some renovation work. At the smallest it would be a connector from a second story walkway/hall over to an existing escalator platform.
Type and sub-type area matrix IEQ EBOM
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Hector Miranda on
I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?
Cork FSC certified?
NC-2009 MRc7:Certified Woodposted by Mario Pinoli on
Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider