Definition of View

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  SUNG SU KIM  on 

In our builing, some regulary occupied spaces are located in B1~B2. To earn this credit 8.2, we decided to make sunken beside B1~B2 wall.

1
Sat Sep 3, 2011, 12:14 pm

Test method

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Paola Figueiredo, Newton Figueiredo  on 

Can a flooring system be tested using the latest version of CDPH test method and still comply to NC 2009? NC 2009, option 2, demands that all flooring products meet the testing requirements of Cal

1
Thu Aug 4, 2011, 7:12 pm

IEQc8.1 Daylighting Spreadsheet Calculator

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Molly Jones  on 

We are working on a project using the May 2011 version of the daylighting and views spreadsheet. We are using excel 2007 with macros enabled.

0

City Supplied Reclaimed Water

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Nicholas Bradley  on 

My project site is already utilizing reclaimed water for 100% of it's irrigation, as required by the local city ordinance. Are we still eligible for this credit?

1
Wed Oct 19, 2011, 8:39 pm

Pre-rinse spray valves

CS-2009 WEp1:Water Use Reduction
posted by  Tapio Peltonen  on 

LEED-CS 2009 form WEp1 version 4.0 states the following: "Note: The flow rate for all pre-rinse spray valves must be less than or equal to 1.6 gpm.

1
Thu Sep 1, 2011, 1:42 pm

Applicability of ASHRAE62.1 in Major Renovation

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Jens Apel  on 

Dear all, This covers more than just ventilation but as this is the most important I put all facts and questions down here. An existing building from the 1970s is undergoing construction works.

1
Wed Nov 23, 2011, 4:00 pm

Projected Biomass Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jose Salinas  on 

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.

1
Fri Aug 26, 2011, 3:25 am

Option 1: Full Flush-out Before Occupancy - Is there a Min. CF?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michelle Bracewell-Musson  on 

With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min.?

1
Thu Sep 22, 2011, 3:37 pm

EA Cre 3 - DES commissioning

General forums
posted by  Adam Targowski  on 

Does anyone know how to deal with Commissioning of District Energy System (DES)?

1
Thu Dec 8, 2011, 5:50 pm

Feedback on 0.5 gpm faucets and recirculation loops

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susan Walter  on 

We're proposing 0.5 gpm faucts for a project and the client is demanding more information from other facilities on these faucets.

0