Equipment efficiencies when LEED boundary covers two floors of the building
CI-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
We have a project where only two floors of a whole building (>5 floors) will be certified under commercial interiors.
District Energy for Partial Building Load
NC-v4 EAp2:Minimum energy performanceposted by Jess Scanlon on
I am modeling a new building on a university campus following LEEDv4 Option 1, Whole Building Energy Simulation.
Social Equity Pilot vs High Priority Credit Equity Plan
Pilot-Credits IPpc89:Social equity within the communityposted by Michelle Rosenberger on
A question arose whether a project could pursue both the Social Equity within the Community Pilot and the v4.1 High Priority Credit Option 2 Path 1 Equity and Community Benefit.
Flooring with resin coated broadcast quartz
NC-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
I have seen several flooring product systems now with resins and coatings that use a broadcast quartz or other inherently non-emitting material as one layer.
Regd. consideration of miscellaneous loads in both proposed & baseline cases as per ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello all,
Regd. Path A or Path B water cooled chiller efficiency selection for base case as per ASHRAE 90.1 2013
NC-v4.1 EAp2:Minimum Energy Performanceposted by Anurag Ghosh on
We have a hospital project using varable water cooled screw chiller with the minimum COP of 5.9 which is defined as per Path B ASHRAE 90.1 2013
G3.1.1 exception d exhaust hood airflow baseline
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
We are looking to use LEED v5 MR Reduce Embodied Carbon Credit as an Innovation Credit
CI-v4.1 IN101:Innovationposted by Donald Green on
What is the expectation in Option #2 for the comparison to a Base Project, Since we have an ID+C Project and there is a high amount of existing walls etc.
Product Certifications - BIFMA Level/GGG, etc
Healthcare-v4.1 MRc7:Furniture and Medical Furnishingsposted by Rachel Thompson on
I am putting together this credit and am not seeing anything obvious around what certifications are needed.
LEED v4 BD+C: SC - Project Information - Site Area
posted by ILDA SHALLO on
We have a LEED project, new addition in an existing school.