Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Ds of VAV

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Cathy W  on 

The Ds is determined by dividing the minimum VAV terminal primary air volume during heating mode by the peak VAV terminal primary air volume during cooling mode. What is a reasonable range of Ds?

1
Wed Aug 31, 2016, 8:08 pm

Minimum HVAC equipment efficiencies

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).

1
Wed Aug 31, 2016, 7:28 pm

Confirmation - Durable goods (furniture)

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Stephen Redding  on 

Please just confirm that the purchase of durable goods (furniture) no longer applies to this or any other v4 credit. (Previously v2009 MRc2.1 furniture)

1
Wed Aug 31, 2016, 9:55 pm

Ez (ZONE AIR DISTRIBUTION EFFECTIVENESS)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SAMY Chamy  on 

Dear All:- we have some doubts in Ez (ZONE AIR DISTRIBUTION EFFECTIVENESS) selection in ventilation design we are supply fresh air using Fresh air fans, ERV, Treated fresh air units, Evaporative

1
Thu Sep 1, 2016, 11:24 pm

Dormitory Washing Machines

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vicki Rybl  on 

I am working on a dormitory project that includes washing machines. The v2009 water use reduction calculator (process tab) has an option for commercial clothes washers, but not residential.

1
Thu Sep 1, 2016, 1:59 pm

Inspection Reports - responsible party

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  komal kotwal  on 

Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same?

1
Sun Jan 8, 2017, 5:22 pm

Can LEED for New Construction be used for Ronald McDonald House

LEED Rating System Selection
posted by  cathy keagle  on 

Our client is going to construct a two story Ronald McDonald House. The community where it where be built is zoned for Commercial MultiFamily Housing.

1
Sun Jan 15, 2017, 6:42 pm

Customer Use of Restrooms

Retail-CI-v4 WEc1:Indoor water use reduction
posted by  Donny Goris-Kolb  on 

Guidance states "If restrooms are not provided for customers within the retail project,.." If the store's restrooms are intended for employee use, but employees are directed to grant customers acce

1
Wed Jan 18, 2017, 4:21 pm

Dirt road?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  emily reese moody  on 

This is the first time I've had a project that has both existing and new dirt roads that will not be paved, or covered with gravel, or anything else. I'm not really concerned about the SRI aspect (

1
Sat Jan 7, 2017, 10:54 pm

Exterior Signage - LEED Online IEQp2 v06

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Noriko Nagazumi  on 

The LEED Online form v06 of this prerequisite asks the user to select either: "smoking is prohibited on the project site" or "smoking is prohibited within 25 feet of entries, outdoor air intakes, a

1
Mon Sep 5, 2016, 12:19 am