Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.
One building.
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by CT G on
We are currently working on a single office project for a corporate client.
Master Site Credit
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Megan Recher on
We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Green-E Equivalency
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by David Ellner on
We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.
Energy Modeling for Design Sumittal
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission
100% Owned
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by SW LEE on
Our project is 100% owned and doing 100,000sf interior refurbishment. No major alteration on HVAC nor the building core itself.
Minimum of green area
NC-v4 WEp1:Outdoor water use reductionposted by Jose Antonio Kovacevic on
there is a minimum of green area (landscape) to comply with the outdoor water use reduction? in v3 I understand should be at least 5% of LEED Boundary.
IEQ4.1 Aerosol Adhesives conversion
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kevin Taterus on
Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont
Commissioning of DATA Centers
Data-Centers-NC-v4 EAc1:Enhanced commissioningposted by Vassil Vassilev on
Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec