HVAC limited scope of worksNC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Jul 13, 2022, 11:06 am
Hi everyone, We are currently working on a Core & Shell project and in terms of HVAC equipment it will comprise VRF units with indoor FCUs. However, the MEP scope of design at this... Last reply: Tyler Thumma, Aug 11, 2022, 10:23 am |
|
ASHRAE 90.1 all electric baseline?NC-v4 EAp2: Minimum Energy Performanceposted by Kevin Gilleran on Jul 27, 2022, 9:48 am
Hi all, Situation: Working on an all electric urban community college classroom building. The domestic water heating is provided by a series of heat pump water heaters. The domestic... Last reply: Marcus Sheffer, Aug 8, 2022, 10:37 am |
|
EPA LEED CHP Calculator?NC-v4 EAp2: Minimum Energy Performanceposted by Erin Holdenried on May 11, 2022, 2:48 pm
Has anybody used the EPA LEED... Last reply: Tyler Thumma, Jun 29, 2022, 10:35 am |
|
Baseline system typeNC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Jun 7, 2022, 1:19 pm
Hi all, We are currently working on a project which is a building with two levels - Ground floor level and Level 01. Level 01 is 1,000 m2 and consists of hotel rooms, whereas Ground floor... Last reply: Nikos Tsitsikas, Jun 9, 2022, 12:08 pm |
|
LEED Credit impact- On site electricity provision from LPGNC-v4 EAp2: Minimum Energy Performanceposted by Robert Yates on May 16, 2022, 5:43 am
Hi I have a site that does not have enough power from the local grid so is considering a self contained LPG based generation on site. I'm just wondering if this will have an impact on any... Last reply: Marcus Sheffer, May 23, 2022, 4:17 pm |
|
Different Baseline HVAC SystemNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on May 17, 2022, 4:50 am
Greetings!.. We have begun the energy modeling for factory building. In addition to the factory, the building houses a warehouse and an administration office. The building has 2,00,000... Last reply: Marcus Sheffer, May 17, 2022, 9:31 am |
|
Firing Range ventilation process loadsNC-v4 EAp2: Minimum Energy Performanceposted by jorge velasco on Apr 29, 2022, 3:25 pm
I am currently working on an energy model for a Firing Range building which will pursue V4 BD+C New Construction. The firing range space requires 75 feet per minute air flow (as per NIOSH). The... |
|
Option 3 without tenant metersNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Apr 28, 2022, 1:17 am
Hi All, We are conducting feasibility study on an existing building in which we are changing chillers. And we are planning to comply under Option 3: Historical Data The building is... Last reply: Omar Elrawy, Apr 28, 2022, 11:02 pm |
|
Off Site Renewable Energy PurchaseNC-v4 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Apr 13, 2022, 2:28 pm
Dear Concern:- I have purchased renewable electrical energy from the nearest solar power plant as Kwh so I have to get a point in Renewable energy via Tier 2 because the solar... Last reply: SAMY Chamy, Apr 14, 2022, 3:04 pm |
|
eQuest can't define steam LoopNC-v4 EAp2: Minimum Energy Performanceposted by Kathy Collins, LEED AP , WELL AP on Mar 10, 2022, 5:38 pm
We have a project that there are two steam plants, one for dehumidifier and processed steam. We have rack washers that use Steam and electricity to do the job. These rack washers are fed by Steam... Last reply: Tyler Thumma, Apr 12, 2022, 9:55 am |