Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

75%

EBOM-2009 MRc8:Solid Waste Management—Durable Goods
posted by  American University  on 

We do a good job of tracking the tons of e-waste and furniture that we reuse or recycle, but we don't do a great job of separating the durable goods out of the waste stream to know the weight or am

3
Wed May 9, 2012, 3:26 pm

Separate Heating and Cooling District Energy Systems

NC-2009 EAc3:Enhanced Commissioning
posted by  James Del Monaco  on 

Our project is located on a University campus with two separate DES buildings. One DES building houses all the chilled water equipment including chillers, pumps, cooling towers, etc.

3
Default Avatar
Sustainability Director, PE
P2S Engineering, Inc.
LEEDuser Basic Member
48 thumbs up
Wed May 9, 2012, 3:10 pm

LOv3 and Macs

Living with LEED Online - quirks, bugs and hiccups
posted by  Elliot Powers, LEED AP BD+C  on 

As a Mac user, I am beyond frustrated with how long it's taken USGBC to make LOv3 compatible with Safari 5.1 (and Lion, although that doesn't affect me so much). A few months ago, I was able to do

24
Sustainable Building Consultant
SPHERA Sustainable Building Consultants
LEEDuser Basic Member
43 thumbs up
Wed May 9, 2012, 12:54 pm

Case 2 Calculator

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Peter Keithly  on 

We had to use the Case 2 calculator because our building was too small to qualify for an Energy Star rating.

2
Default Avatar
Principal
TEAM Commissioning Associates
LEEDuser Basic Member
3 thumbs up
Wed May 9, 2012, 12:06 am
3
Default Avatar
Business Development Manager
Entegrity
LEEDuser Basic Member
154 thumbs up
Tue May 8, 2012, 11:34 pm

Cabinetry

posted by  Summer Gorder  on 
3
Default Avatar
Senior Preconstruction Manager
MaxFour
LEEDuser Basic Member
7 thumbs up
Tue May 8, 2012, 10:30 pm

Tenant's Access to BMS Room

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Maya Karkour  on 

Dear all, We're developing an M&V Plan for a large commercial mall.

3
Default Avatar
Project Engineer
Integral Group
LEEDuser Basic Member
23 thumbs up
Tue May 8, 2012, 10:13 pm

White polyethylene SRI

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Guillermo T. Adamo  on 

Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70% density.

3
Tue May 8, 2012, 8:32 pm

Timing of IAQ testing compliance

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anders Olson  on 

I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit.

4
Sustainability Manager
Clark Builders
LEEDuser Premium Member
8 thumbs up
Tue May 8, 2012, 8:17 pm

Flushout calcs for Option 1 Path 1

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Mark Haynie  on 

To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)?

2
Default Avatar
CIH, LEED AP, CBCP
CIH Environmental Solutions
LEEDuser Basic Member
3 thumbs up
Tue May 8, 2012, 3:47 pm