Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Rating System for tenant in existing building

LEED Rating System Selection
posted by  Jennifer Isaac  on 

My client is a pharmaceutical facility that occupies part of the area of an existing building.

0

Reject Water from Reverse Osmosis system?

NC-2009 WEc1:Water efficient landscaping
posted by  Eric Bautista  on 

Dear Fellow LEED Users, In the Irrigation Design Case tabulation, can I declare "reject water" from reverse osmosis equipment system of campus, as the source of non-potable water? Thanks in advan

0

DES Rates

General forums
posted by  Valentin Grimaud  on 

We are working an a project about a building using purchased hot water and purchased chilled water from DES.

1
Tue Jun 21, 2016, 2:21 pm

IAQ management plan-during construction or before occupancy

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Kali Wolin  on 

I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.

1
Fri Jun 17, 2016, 12:42 am

LEED Pilot Credit 30

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  S. Sachs  on 

We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi

1
Tue Jun 28, 2016, 8:14 pm

V4 EBOM - Commissioning

EBOM-v4 EAc2:Existing building commissioning—implementation
posted by  Meier Corporate Account  on 

Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.

1
Mon Jun 20, 2016, 9:47 pm

What are the baseline conditions?

EBOM-v4 SSc5:Site management
posted by  Zachary Hayes  on 

This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?

0

Modeling Procedure for ERV,HRW,Treated Fresh Air Units

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air unit

1
Fri Jun 17, 2016, 1:02 pm

HVAC modelling for Tenant Occupied Spaces

CS-2009 EAp2:Minimum energy performance
posted by  Saumendra Aggrawal  on 

I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.

1
Sun Jun 19, 2016, 8:52 pm

Thermal Comfort - Adaptive Method

NC-2009 IEQc7.1:Thermal comfort - design
posted by  SAMY Chamy  on 

Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c areas and Adaptive method for ventilated areas (due to lack of

0