Forum » Healthcare-v2009 IEQc3.2
Topic | Recent |
---|---|
Additional Flush-out Duration after Air Test FailedHealthcare-v2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Kim Lombard on May 9, 2017, 3:40 pm
If Option 2 for an air test fails, the remedy is .... "....conduct an additional flush-out with outside air and retest the noncompliant concentrations. Repeat until all requirements are... Last reply: Kim Lombard, May 10, 2017, 2:50 pm |
|
Number of testing pointHealthcare-v2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Emil Andersson on Oct 9, 2012, 4:00 am
Hi. The credit language states that the number of sampling locations will depend on the size of the building and the number of ventilation systems. We have 21 identical built... Last reply: Emil Andersson, May 31, 2013, 5:03 am |