eQuest 3.65 model

CS-2009 EAp2:Minimum Energy Performance
posted by  František Bartoš  on 

Hello, I made model of quite simple rectangular office building in eQuest v3.65 and energy simulation run succcesssfully, but compliance analysis end with error code ""Error Assign zone to baselin

3
Mon Nov 18, 2013, 4:20 pm

Carpooling, Ridesharing?

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Maria Porter  on 

First question: In SSc3.3 for CI reserved parking spaces for car/vanpools are to be at least 5 % of FTE. In NC SSc4.4 parking spaces should be reserved for 5 % of number of parking spaces.

9
Green Mystic in Residence
LEEDuser Basic Member
75 thumbs up
Mon Nov 18, 2013, 11:33 am

Single zone VAV and 62MZ

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

Hi. I'm working with a building that has a VAV that supplies OA to a single room based on the numbers of people on that space.

4
Mon Nov 18, 2013, 6:07 am

Paints & Coatings

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Caroline O'Leary  on 

I'm trying to determine if I have covered all of my bases for Paints & Coatings. I am working under LEED NC Retail 2009.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 18, 2013, 2:19 am

Project boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sarah Dahman  on 

Hi! I'm working on a project which is a new office building. It includes underground parking for the building users.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Nov 17, 2013, 11:27 am

Swimming pool Amenity facility

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Lilian Seow  on 

There's a swimming pool located in the lobby area as part of the amenity facilities for a multi-residential building. Is this a required area for IAQ c3.2 [flushout or air test] ?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Nov 16, 2013, 2:11 am

First LEED Project. Which LEED System?

LEED Rating System Selection
posted by  IOANNIS LADOPOULOS  on 

I have a 6000sf existing building with almost 70% of it offices and 30% retail. All building is under the same management. I have the operation data for all months.

6
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Fri Nov 15, 2013, 6:22 pm

Base building consumption breakdown

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  František Bartoš  on 

Hello, is there any specification how should be consumption of base building divided and measured?

2
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Fri Nov 15, 2013, 3:37 pm

Distinctions in Design Control

CS-2009 PIf5:Building System Control
posted by  Michelle Rosenberger  on 

What is the distinction between Owner/Developer, Tenant and Lease Amendment?

4
Fri Nov 15, 2013, 2:00 am

Question Regarding Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Brian Salazar  on 

Hello again! We are finalizing our model for a v3 Core and Shell Building Renovation. Our model is telling us that our process loads are under the requisite 25%, 23.66% to be exact.

5
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Thu Nov 14, 2013, 6:37 pm