Forum quick links
District Energy - 3rd Party Analysis Requirements
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Phil Stafa on
Regarding EAp3 for a district energy system, do all chillers included in the district plant (CFC and non-CFC) need to be included as part of the alternative compliance simple payback analysis? Do
Showerhead with multiple settings
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by AtSite Inc on
To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.
Ergonomist Design Phase Involvement
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
This may be an obvious answer, but it seems a little vague to me.
ID credit for college or university
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Cindy Quinn on
Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?
mutiple or single zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Richard Land on
Hi All At risk of looking foolish has anyone succesfully presented an AHU serving a single zone when all those zones are identical?
Brownfield remediation
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
Financial donation
NC-v4 SSc2:Site development - protect or restore habitatposted by Florian Schmidtchen on
Dear all, As we all know it is possible to get ‘Exemplary-Performance-Points’ by double the appropriate credit requirements.
Rating System Selection
posted by Patrice McVeigh on
Hi, I have a project that is currently undergoing LEED certification for NC Major Renovation, with the certification due in the next two months.
Submitting a Product to meet LEED Certification
posted by Jeremy Henak on
Looking at what the process is for submitting a product for LEED certification. Thanks, Jeremy
Are basement walls included in envelope calculations
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Stacey Olson on
I understand the floor slab of basements is allowed to be included; what about the envelope?