Forum quick links
Certifications other than GreenGuard
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Nilda De Coutte on
Hi, we´re working on an office project that is buying all new furniture and we were curious to know if furniture with other international certification like the "EU Ecolable" certificate, was appli
IEQP1 VRP Calculator saying I'm non-compliant
NC-2009 IEQp1:Minimum IAQ Performanceposted by Joe Sechler on
Figured out my question. Please delete
LEED Design submital - First Review
posted by Bridget Brock on
At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.
LEED Boundary for an Existing Multitenant Building
EBOM-2009 MPR3:Must use a reasonable site boundaryposted by Gabriela Crespo on
Dear All, We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to participate in th
Peak discharge/flow rate
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by hana manai on
Which formula do you use to calculate peak flow rate (1 and 2-year, 24hours). I am using NRCS (SCS) TR-55 Graphical Discharge Method. Is that recommanded?
Campus project (Master site) with 4 buildings
NC-2009 EAc2:On-Site Renewable Energyposted by Peg Manuel on
We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.
Tenant Installed Equipment and Appliances
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Keohane on
I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.
"Material Value" in LEED credit calculation
posted by Nasim Daryaee on
Hi every one, I have a general question regards definition of " Material Value" .ie, my structure steel value in the manufacture is 200K and the cost I paid to my sub after fabrication ...
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.