Forum quick links
LEED EBOM Facilities Alterations and Additions
posted by Peter Gibney on
We are analyzing an existing building and determining the rating system to follow.
IEQc4.1 and IEQc4.3 and silica sand in sanded grout
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Jill DeMarotta on
Has anyone found a sanded grout that doen't have silica sand in it? It seems like our only option is to go with an unsanded grout or something more expensive....
Tenant Area HVAC System
CS-2009 EAc1:Optimize Energy Performanceposted by Nidhi Khanna on
Hi, I am working on a mixed use project with retail on 1st floor and office on 2nd and 3rd floor with a total project area of 115,000 sf.
Everything is an assembly.
CI-2009 MRc5:Regional Materialsposted by Valerie Molinski on
I recently got a review back that said that every material I am using to demonstrate compliance for Mrc5 is an assembly and "therefore, the individual components must be separated by weight." Sinc
Forklifts as Individual Workstations
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Craig Wilson on
I am working on certifying a warehouse, and would like to consider the forklifts as individual workstations, as the warehouse employees are each assigned one (in lieu of a desk) and allowed to pers
Vehicle tracking control dirt road
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Juan Robles on
We are working on a project in Costa Rica where the access road is a dirt road.
Full Height Glazing
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Lauren Bellamy on
Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height o
Technical Manual for new Green Globes for New Construction
posted by Charles Kibert on
As some of you know the Green Building Initiative is releasing the new version of Green Globes for New Construction which is based on ANSI/GBI 01-2010," Green Building Assessment Protocol for Comme
raised floor
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Florinda Garcia on
does the raised floor has to meet the floorscore requirements?
extraction location for petroleum based raw materials
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Melissa Vernon on
I am working on documentation for this credit but need some advice.