Forum quick links
LPB for a Residential Building Excluding the Shopping Mall
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Orçun Özhelvaci on
Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr
floor area for PIf3 vs IEQc8
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Ward Miller on
We received Construction Review comments that the areas reported in PIf3 do not correspond to the areas in IEQc8.
Applicable or not
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Catherine Blakemore on
My project has one floor that does not have any individual workstations. All the spaces are multi-purpose spaces.
LEED v2009 NC Total Daily Occupancy - Help Please!
NC-2009 PIf3:Occupant and Usage Dataposted by A Commings on
I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy.
New requirements in Version 5.0 form for LEED-EB: O&M v3/2009?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Peter Dahl on
I’m seeing Version 5.0 of the IEQp1 form for LEED-EB: O&M appear in some of my projects.
Cool Initiative
posted by Kathryn West on
I call dibs on the Bahamas and Maldives! :) I'm surprised the Maldives haven't documented LEED compliance for any buildings they are very eco-friendly.
Wood waste to be recycled into biomass fuel
NC-2009 MRc2:Construction Waste Managementposted by Noriko Nagazumi on
Hi, Our project emits a certain volume of wood waste, which is used mainly for packaging equipment.
Design review appeal
posted by Inés Alomar on
We have been denied a prerequisite from the Design Phase after the second review, and now we need to appeal them or start with the construction review. We have two main questions: Do we have any ti
ASHRAE/IECC Compliance for AHU's, RTU's and Heat Pumps
NC-2009 EAc3:Enhanced Commissioningposted by Peter Dishno on
Hello Design Review Experts, During a design review for a residential high rise, we noted that several areas of common space did not seem to have the capacity to use an economizer, Demand Control
Use of EA Cr 6 for a CS Project
EBOM-2009 EAc6:Emissions Reduction Reportingposted by emily reese moody on
Hi, I'm wondering if anyone has tried attempting this credit as an ID strategy in a CS project.