Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Reheating more than 30% at the VAV

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the VAV box. 

2
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Wed Sep 18, 2024, 3:28 pm

Laboratory Spaces baseline system in warm climate and proposed building is electrified heating

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Russell Knudson  on 

For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall ei

1
Thu Sep 26, 2024, 3:51 pm

Clubhouse Building Type? Public Assembly or Non-Residential?

NC-v4.1 EAc2:Optimize Energy Performance
posted by  Junaid Mujahid  on 

A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under which

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 18, 2024, 8:00 am

Clarification Needed on Reporting Bus Trips

NC-v4.1 LTc5:Access to Quality Transit
posted by     on 

I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Sep 18, 2024, 6:50 am

SS Credit: Rainwater Management - Option 2 - Natural land cover conditions

CS-v4.1 SSc4:Rainwater Management
posted by  Finance Team  on 

Hi All,

We are working on a major renovation of an office project (shell only) and aim to certify it under the LEED v4.1 BD&C CS scheme.

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Tue Sep 17, 2024, 9:19 pm

5 year replacement period?

CI-v4 EAp3:Fundamental refrigerant management
posted by  Laura Charlier  on 

"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used.

0
3
Lead Mechanical Engineer
Hoefer Welker
LEEDuser Basic Member
2 thumbs up
Mon Sep 16, 2024, 7:17 pm
2
sustainability director
Revel
LEEDuser Basic Member
0 thumbs up
Mon Sep 16, 2024, 3:39 pm