Forum quick links
Do I have to use DES Guidance?
posted by JOSE R. TAGLE on
We´re working on a Resort LEED Project (one owner) conformed by a Hotel, service buildings, SPA and villages, LEED boundary is considering only Hotel and Service Buildings, however, Cooling Plant (
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
Scope of EAp2 we must include to meet the compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Takayuki Hirota on
We are planning to renovate an existing building which is used as an office, aiming for LEED CI certification.
MERV for Filters
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Farah A. on
Are MERV 13 filtration media used for temporary or permanent air handlers?
LEED-CS vs LEED for Homes
posted by Beth Nelson on
Please advise whether you think LEED-CS is the appropriate rating system for the project, giving the following: - The project involves converting an existing 2-story warehouse into condos.
LEED EBOM group certification
posted by Isabel Santos on
Dear all, I have a question about LEED EBOM group registration and certification fees.
LEED BD+C Question- Individual Thermal Comfort Controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Farah A. on
A project design team has design their new office space with an open office plan and operable windows to provide natural ventilation.
FSC Certified Wood
NC-2009 MRc7:Certified Woodposted by Farah A. on
I have another ques. regarding Certified Wood- Which of the following FSC products can count towards the Certified Wood criteria ?
COC requirements
NC-2009 MRc7:Certified Woodposted by Farah A. on
Which of the following pieces of documentation are required to demonstrate compliance with MR Credit 7 Certified Wood?