Air Locks and Negative Pressure

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Raina Tilden  on 

The project I am working on consists of a huge machine shop on one side of a glass wall and offices on the other side of the glass wall.

1
Wed Mar 19, 2014, 2:25 pm

Using BD+C SSc4.1 as an EBOM IO credit

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Michael Smithing  on 

We're working on the EBOM certification of a building with excellent public transportation. Has anyone attempted to use SSc4.1 as an IO credit in EBOM?

1
Wed Mar 19, 2014, 3:58 pm

Pilot Credit Closed

Pilot-Credits SSpc7:Light pollution reduction
posted by  Bill Swanson  on 

Pilot Credit Closed This pilot credit is closed to new registrations

1
Wed Mar 19, 2014, 6:35 pm

Purchased Energy Rate

General forums
posted by  May Xu  on 

We are working on a project consisting of several offices and residential buildings, but LEED boundary is considered only one of the office building.

1
Thu Dec 11, 2014, 3:00 pm

greenhouse as a connection to the outdoor

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  FABIO VIERO  on 

We are assessing a two stories office building composed by three main office blocks, each one connected by two greenhouse blocks hosting plants and people as a break area (non regularly occupied ar

1
Thu Mar 20, 2014, 9:09 pm

Not all systems are implemented by the time of occupancy

NC-2009 EAc3:Enhanced Commissioning
posted by  Magda Aghababyan  on 

Dear all, Can you please advise me on a situation where the design states part of the building to be conditioned and the other part is ventilated but by the time occupancy happens the owner has de

1
Tue Mar 25, 2014, 8:03 pm

Group certification with lockers

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Fabien Challeat  on 

I'm working on a factory project, consisting of 7 buildings. Among them, three are lockers buildings (I mean exclusively lockers, without any other spaces).

1
Fri Apr 11, 2014, 8:39 pm

Process refrigerant conversion

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Jennifer Knocha  on 

We have a walk-in freezer and refrigerator that have CFCs in them. All the references for a conversion or phase-out plan only reference HVAC equipment.

1
Fri Apr 11, 2014, 8:29 pm

Calculating Hazardous Glass Area

Pilot-Credits SSpc55:Bird collision deterrence
posted by  ray keane  on 

How is the Hazardous Glass Area (HGA) calculated for each material? Is a material with a higher threat factor weighted the same as a material with a lower threat factor?

0

Existing Envelope for LEED v3

NC-2009 EAc1:Optimize Energy Performance
posted by  Ken Pilcher  on 

Any help regarding the reuse of an existing building LEED simulation would be helpful. We are working on an existing building that was a warehouse and is now an office building.

1
Sun Mar 23, 2014, 8:07 pm