I'm working on a factory project, consisting of 7 buildings. Among them, three are lockers buildings (I mean exclusively lockers, without any other spaces). According to IEQ Space Matrix, credits IEQc6.1 and IEQc6.2 are not applicable to lockers, therefore my concern is: can we apply for those credits as a group certification even if 3 of our buildings are not eligible to IEQc6.1 and IEQc6.2? Another way would be to consider lockers as a multi-occupied space (we have a FTE of 8 per locker and they are regularly occupied) and then comply with requirements of the credits for all the buildings. Is it an acceptable solution? Any advise would be appreciated. Thanks
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.