Forum quick links
Adhesive for insulation instalation
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Joanna Bloniewska on
How would you qualify an adhesive for insulation instalation? I am not sure which VOC limit is the most appropriate.
M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Philip Herriges on
The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&
Furniture included?
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by severine secret on
Using LEED NC 2009, do we need to include furniture items, such as workstations, task chairs and their related components as required for IEQ.45 in LEED CI requirements?
Two Year HVAC Electricity Use
CI-2009 EAc4:Green powerposted by Joseph Greene on
Our LEED project occupies 30% of the total building floor area. The energy model modeled the entire building due to a central boiler and condenser water plant.
sanitary installations within tenant fit-out
NC-2009 WEp1:Water use reductionposted by Michael Haugeneder on
Hello all, Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage.
certification boundary
posted by Michael Haugeneder on
Hello, I would like to ask some questions about the certification boundary. 1. A project of mixed use (retail+offices and hotel) is being certificated within 5 floors.
natural ventilation in underground parking?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Michael Haugeneder on
Hello, is it possible to aim the credit IEQc5 if a project doesn't have a mechanical ventilation in the underground parking (UP)?
single stream recycling
CI-2009 MRp1:Storage and collection of recyclablesposted by Adam Targowski on
Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all fi
no change of flow fixtures
CI-2009 WEp1:Water use reductionposted by Adam Targowski on
We have a project that consists of an office space with toilets however the folw fixtures are not going to be changed. Is this project exempt from earning this prerequisite?
Wooden fire door - security requirement
CS-2009 MRc6:Certified woodposted by Jose Antonio Kovacevic on
We are certifying a Core and Shell office building.