Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Do non-contiguous habitat areas qualify?

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Jennifer Rennick  on 

We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.

0

Interested in setting 'best practices' and permit/review template for embodied carbon? (LCA/WBLCA)?

Green Commons
posted by  Barbra BatShalom  on 

Greetings!

Back again re: the work we're doing with City of Cambridge, in their great leadership efforts to develop EC policy/regs/incentives and reporting requirements.

0
1
Sun Apr 30, 2023, 11:10 pm

Lights mounted under a photovoltaic canopy

CS-v4 SSc6:Light pollution reduction
posted by  Samuel Calhoun  on 

Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?

0

INpc142 Safety First Pilot Credit Arc Re-Entry

EBOM-v4.1 INc1:Innovation
posted by  Barry Abramson  on 

Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented for

0

INpc139 Safety First Pilot Credit - Building Water System Recommissioning

EBOM-v4.1 INc1:Innovation
posted by  Barry Abramson  on 

We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic.

0

Close-out of INpc156 - Safety First: Maintenance of HVAC systems during COVID-19

Pilot-Credits INpc156:Safety First: Maintenance of HVAC systems during COVID-19
posted by  Barry Abramson  on 

We pursued this credit for several projects in 2021/2022. It was useful to ensure adequate HVAC maintenance was sustained through the pandemic, but at this point it should be standard practice.

0

No issues

Pilot-Credits EApc111:Alternative Performance Rating Method
posted by  Maureen Mahle  on 

I haven't found any major issue for this credit.

0

LEED Timeline / Schedule

LEED v4.1 Discussion Forum
posted by     on 

Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? 

Thanks

0