Topic | Recent |
---|---|
Addenda to ASHRAE standardsCS-2009 IEQp1: Minimum indoor air quality performanceposted by Jens Apel on Jun 7, 2012, 3:23 am
Edit: question has already been answered in February 2012 here: http://www.leeduser.com/credit/CI-2009/EAp2 |
|
ASHRAE Standard 62.1- 2010CS-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on May 16, 2012, 8:32 am
Hello, Does anyone know if the ventilation system/strategy of a LEED 2009 project can be designed according to ASHRAE 62.1-2010 instead of 62.1-2007? I haven't looked at the 2010,... Last reply: Emily Catacchio, Jun 4, 2012, 8:23 pm |
|
Tenant Space VentilationCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on Apr 24, 2012, 11:17 am
Hi everybody; I'm working in a CS office building with a designed ceiling plenum natural ventilation system for tenant spaces. The owner of the project will be providing the louvered... |
|
lease agreement for residential unitsCS-2009 IEQp1: Minimum indoor air quality performanceposted by Carolina Vergnano on Mar 29, 2012, 3:55 pm
We are working on a CS muti-unit residential project. There will be infrastructure for residents to use splits in their units. According to the item 5.9 of ASHRAE 62.1-2007 the project has to... |
|
Office shell spaceCS-2009 IEQp1: Minimum indoor air quality performanceposted by Orlin Velinov, PE on Mar 15, 2012, 9:54 am
We have C&S office building where the majority of the spaces are shell spaces for future office space. Since at the moment we do not know what is going to be the exact distribution (offices,... |
|
Areas to be consideredCS-2009 IEQp1: Minimum indoor air quality performanceposted by Angela Saggin on Feb 27, 2012, 12:38 pm
Hi! What areas/rooms should we consider inside an appartment for the calculation of naturally ventilated spaces? For example, the master bedroom has a dressing room and a bathroom, should... |
|
Air Extraction SystemCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on Nov 22, 2011, 9:47 am
We are working on a natural ventilated CS office building. The entire building is going to be natural ventilated with no AC. The bathrooms are the only areas with an air extraction system, but we... Last reply: Luis Miguel Diazgranados, Jan 11, 2012, 11:43 am |
|
Particulate Matter RemovalCS-2009 IEQp1: Minimum indoor air quality performanceposted by Paula Hernandez on Jan 10, 2012, 8:40 am
Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a... Last reply: Dylan Connelly, Jan 10, 2012, 11:16 am |
|
Garage and technical roomsCS-2009 IEQp1: Minimum indoor air quality performanceposted by BH . on Sep 2, 2011, 4:49 am
We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do we need to... Last reply: Luis Miguel Diazgranados, Nov 30, 2011, 4:11 pm |
|
uncondtioned space and natural ventilationCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on Aug 30, 2011, 3:09 pm
Hello We are working on a office building applying for LEED CS. The building is going to be naturally ventilated. we haven't been able to understand if naturally ventilated spaces are... Last reply: Luis Miguel Diazgranados, Nov 23, 2011, 11:15 am |