Open Sales Area- qualificationsCS-2009 EAp2: Minimum Energy Performanceposted by charles bell on Jan 22, 2014, 8:57 am
We are on our final review for EAp2 and have changed site area from plaza designation to an "outside sales area." The owner proposes to have concerts, arts festivals,etc. There will be vendors... Last reply: Marcus Sheffer, Jan 22, 2014, 3:27 pm |
|
Reset temperature??CS-2009 EAp2: Minimum Energy Performanceposted by charles bell on Jan 22, 2014, 9:08 am
We are on our final review. LEED reviewers have stated that the Baseline Case system input reports indicates that supply air temperature reset was not modeled as required by Section G3.1.3.12.... Last reply: Marcus Sheffer, Jan 22, 2014, 12:19 pm |
|
lighting requirementsCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Jan 18, 2014, 11:43 am
And one more thing just to be sure: Does the project need to comply with lighting power allowance requirements of sections 9.5 or 9.6 (ASHRAE 90.1-2007)? The credit language states that we have... Last reply: Marcus Sheffer, Jan 18, 2014, 7:11 pm |
|
baseline HVAC system selectionCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Jan 10, 2014, 11:44 am
I would like to clarify the basis of baseline HVAC system selection in energy modeling. Selection is based, among others, on number of floors and conditioned floor area. I would like to ask if... Last reply: Marcus Sheffer, Jan 10, 2014, 11:51 am |
|
Facade LPD requirementCS-2009 EAp2: Minimum Energy Performanceposted by Lolita Wu on Jan 9, 2014, 10:07 pm
As the mandatory provision in ASHRAE 90.1 section 9.4, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface. In our project, we have two different lighting systems and... Last reply: Marcus Sheffer, Jan 10, 2014, 9:33 am |
|
Tenant area with prescribed HVAC system in a CS projectCS-2009 EAp2: Minimum Energy Performanceposted by farhana imran on Dec 24, 2013, 5:09 am
Dear Expert, Last reply: farhana imran, Dec 26, 2013, 9:38 am |
|
Receptacle equipment in a Core&shell office buildingCS-2009 EAp2: Minimum Energy Performanceposted by Eleftherios Zacharakis on Dec 11, 2013, 10:18 am
When using Table G-C in User's Manual for ASHRAE Standard 90.1-2010 to define the receptacle equipment power... Last reply: Marcus Sheffer, Dec 11, 2013, 12:08 pm |
|
airflow control in a reference buildingCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Nov 19, 2013, 5:41 am
In our proposed building we have CAV ventilation system which at night (when there's noone in the building) will provide 50% of the designe airflow rates. That's why for the simulation purposes... Last reply: Marcus Sheffer, Dec 10, 2013, 11:40 am |
|
Primary Secondary Pumping PowerCS-2009 EAp2: Minimum Energy Performanceposted by Matt Humphreys on Dec 6, 2013, 1:30 pm
When modeling a project that has a baseline building requiring system #8, the system cooling tonnage is > 600 tons therefore G3.1.3.10. calls for a primary/secondary pumping loop served by... Last reply: Marcus Sheffer, Dec 6, 2013, 1:56 pm |
|
Pressure Drop AdjustmentCS-2009 EAp2: Minimum Energy Performanceposted by Jan Hesse on Dec 6, 2013, 9:08 am
We are working on a Project with a central 100%OA... Last reply: Marcus Sheffer, Dec 6, 2013, 12:04 pm |