Enclosed Parking Garage VentilationCS-2009 EAp2: Minimum Energy Performanceposted by Gabriela Mena on Oct 27, 2020, 10:33 am
Hi, We are working on a CS V2009 project that is willing to control the parking garage ventilation by detecting contamination levels. According to ASHRAE 90.1-2010, the airflow... Last reply: Tyler Thumma, Nov 6, 2020, 9:14 am |
|
Chilled beams with default occupancyCS-2009 EAp2: Minimum Energy Performanceposted by Manuel Martin Delgado on Jun 29, 2020, 7:11 am
Hello, We have an office building designed with DOAS CAV (20degC ) and active chilled beams with induction factor of 4 (at 18.5degC). The fresh air for higenic reasons is 40m3/h*person,... Last reply: Tyler Thumma, Aug 21, 2020, 11:33 am |
|
Modelling Chilled water pump Power for the BaselineCS-2009 EAp2: Minimum Energy Performanceposted by Indochine Engineering VN on Nov 9, 2017, 10:30 am
Hi LEED experts, I just received LEED reviewer comment. They said "It appears that each Baseline pump has been modeled with a power of 22 W/gpm. ASHRAE Interpretation ASHRAE/IES IC 90.1-... Last reply: JamieDamon Damon, May 8, 2020, 5:32 pm |
|
Installed and not Installed HVACCS-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Jan 3, 2020, 9:50 am
Hi, I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems. ... Last reply: Paula Hernandez, Jan 8, 2020, 6:10 am |
|
heat recovery in baselineCS-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Aug 27, 2018, 6:30 am
I'm using v2009_Minimum Energy Performance Calculator_v09.xlsm In the tab "Air-Side HVAC" it specifies that energy recovery is required "For Baseline, any individual systems where supply... Last reply: Marcus Sheffer, Dec 22, 2019, 5:22 pm |
|
Claim savings with reference to tenant fit out lighting drawings in lieu of tenant lease agreementCS-2009 EAp2: Minimum Energy Performanceposted by Eric Dixon on Nov 5, 2019, 10:04 am
I have a situation where my company has been contracted to design and submit for LEED both the C&S for the building developer, and the CI for the tenant. The TLSA has already been executed by... Last reply: Marcus Sheffer, Nov 5, 2019, 11:10 am |
|
AHU Fan Power RequirementCS-2009 EAp2: Minimum Energy Performanceposted by Summer on Sep 19, 2019, 6:57 am
I have a CS project in which the... Last reply: Marcus Sheffer, Sep 20, 2019, 12:04 pm |
|
Fresh air for toilet vestibule according to ASHRAE 62.1-2010CS-2009 EAp2: Minimum Energy Performanceposted by Przemysław Rejczak on Apr 8, 2019, 7:10 am
Dear Everyone I am writing regarding to fresh air requirements for Baseline Case. According to new ASHRAE 90.1-2010 requirement it should be modeled according to rating authority or... Last reply: Marcus Sheffer, Apr 10, 2019, 3:36 pm |
|
G3.1.1 | Exception b (40 equivalent full-load hours per week)CS-2009 EAp2: Minimum Energy Performanceposted by Danilo Ilic on Apr 1, 2019, 5:03 am
From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am... Last reply: Danilo Ilic, Apr 1, 2019, 9:39 am |
|
Interior lighting in dwelling unitsCS-2009 EAp2: Minimum Energy Performanceposted by Ashish Nautiyal on Mar 22, 2019, 3:47 pm