furnitures installed before the flush out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjie Herrera on
Can furnitures be installed before the flush out?
VOC testing method
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Ralph Bicknese on
Does GBCI require a certain testing method for VOC compliance?
Path 2: Storm Water Quantity Control - Discharge into Estuary
CI-2009 SSc1:Site Selectionposted by Gail Williams on
Hello, We are working on a project in Ireland where the surface water runoff from the site flows directly into a tidal reach (estuary) without attenuation, as this has been confirmed to be the mo
question about a building at a major port
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
client has a office building (previously developed land) being built along a waterway at a major US port.
Glare Control - Glazing film
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kristina Abrams on
Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?
Documenting Diversion Quantities
NC-2009 MRc2:Construction Waste Managementposted by Jennifer Kissinger on
We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the s
Two Contractors at the same time (LEED NC or C&S)
posted by Rosana Correa on
Commercial C&S building.
Low flow pre rinse spray valve in Europe
posted by Charline SEYTIER on
EUROPE: Pre-rinse spray valve 1.6gpm or lower Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in
One 62MZCalc for each AHU?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Aurelie Simon on
Dear all, We have a 10-storey office building located in Germany with 1 AHU for each floor. Each AHU serves different zones (office, storage, kitchen etc.).