Can I lock the credits not to be touched by other team members ?
posted by Matt Dem on
Is there any feature in LEED online to lock the credits not to be changed by other team members ?
Filed (2)exemp. performance credit under (1) ID in case one fail
posted by Matt Dem on
Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.
Can I defer any ID credit to submit it w/ construction package ?
posted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
posted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
LEED Credit Timeline
posted by Brenna Martin-Shaffer on
During the process of our split submission information was submitted to GBCI that affected both a prerequisite as well as a credit we were pursuing.
Re-submission for Design Review
posted by Madhura Dhayagude on
We are currently working on a project that had submitted documentation for Design review.We were not on board then. After the review, the project went on a hold for a period of almost 3 years.
New credit after the preliminary combined review process
posted by Stella Stella on
Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?
LEED CI - deadline for submitting documentation
posted by Devanand Ragbir on
We registered the Project for LEED CI. A space of about 2000 sqft. As the space was small the client was able to outfit the space in 3 weeks time and occupied the space immediately after.
When can construction review start for a NC project
posted by Pia Öhrling on
How much of the building must be ready before you can send in constuction review?
Submitting New Design Credits During Construction Review
posted by Charlie Haas on
I am working on a project that underwent a split review. We have received and accepted our final design review submission.