NC Innovation credits from EBOM, design or construction review?
posted by SmithGroup BG+LU FW on
If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can
LEED Online and iPad
posted by Elizabeth Brodbeck on
Is it possible to access LEED Online from my iPad?
Prelim Design Review
posted by Phil Meyer on
Is it possible to include a few construction credits in your LEED prelim design review submission?
Anticipated Review Return Date Question
posted by Kathy Wislocky on
I haven't submitted for review in a very long time. Could someone confirm if the "anticipated return date" after my preliminary review is a hard date or just a recommendation?
Can LEED interpretations be enforced on older LEED versions?
posted by Sandra Bauder on
It is my understanding, that though one can choose to quote a CIR for equal treatment under a specific credit, CIR's do not constitute a formal part of a credit requirement. Specifically, we are pu
LEED® Certification Agreement
posted by Albert Sagrera on
Once finalized the justification of credits, and uploaded the information to begin the process of Design Preliminary Review, in the section Overview, we get this message: " Your selections do not m
When to submit for construction Review
posted by Jon Quigley on
Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?
Denied Design Credits
posted by Karim Farid on
If a Design credit was denied in the Final Design review, can I resubmit it with the Construction credit after addind the missing information
Design review appeal
posted by Inés Alomar on
We have been denied a prerequisite from the Design Phase after the second review, and now we need to appeal them or start with the construction review. We have two main questions: Do we have any ti
APPEAL DESIGN CREDITS AFTER CONSTRUCTION PRELIMINARY REVIEW
posted by Jose Antonio Kovacevic on
In a Core and Shell building we are finishing the construction process and we have obtained 47 points in the design stage. The goal of the owner is a GOLD certification,we must have at least 13 poi