posted by soha yamani on
i have a certified project under NC v 2009 it was registered on 5/30/2010 the certified project consist of 1- a building that consist of a ware house zone labour zone and administration zone
Parking Garage & Office/Hangar Buildings
posted by S D on
We have two projects on one site, a parking garage (not a LEED project) and an Office/Hangar which will be submitted for LEED certification (registered under v2.2).
invidually buildings ceritifcation vs multiple buildings/ campus
posted by Muhammad Faisal Azizullah Jaffar on
My project is based in Qatar and the total site area is around 13,000748 m2 of GFA comprising of 10,654 sqm of retail, 78,563 sqmof commercial office space including, 132sqm of atrium circulation,
Campus Site Boundaries and Group Building Certification
posted by Jason Biondi on
Good afternoon. Thank for the forum.
Campus with Already Certified Building
posted by Simon Sue on
We're in a situation where two existing buildings, Building A and B, are in the same campus.
Phased Project Executed Under Different Construction Contracts
posted by Blake Thames on
After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase
New Campus Tool
posted by Brian Leet on
I am having a great deal of trouble finding any indication of how the campus side of the new site works. (For that matter, it took some scouring to even find the new site.
Group project certification and PIf2
posted by Noriko Nagazumi on
The following message appears if a total of more than one building is selected in "Number of buildings attempting certification as part of this LEED Application:" at PIf2: "At present, only one bui
Using the Group EAP2 Spreadsheet
posted by Robert Wichert on
Does anybody have any experience with the Excel spreadsheet for group energy analysis?
LEED for Campus Master Site registration
posted by Ludmilla Pavlova-Gillham on
My campus is considering registering our entire campus site (1400+ acres) under LEED for Campus. To whom do I issue the registration fee check - to USGBC or GBCI?