Forum quick links
LEED CI 2009 : Project without HVAC change
posted by Diana Hill on
We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.
Two building connected by bridge.
posted by Zonda E. Team on
The project involves two buildings, one is an office+workshop (50,000 sqf) and the second building is Dining area for the first building (7,000 sqf).
LI #2500/#10209 Shower Requirements for Mixed Use Buildings
posted by Michelle Rosenberger on
This section is a great idea, thanks.
LEED for Health Care or NC registration
posted by Razan Nejem on
is it mandatory for a health care facility to register under LEED HC rating system or can it choose to go with LEED NC?
New LEED boundary definition for SSc8
posted by Bill Swanson on
10/1/2012 ID# 10236 MPR/Prerequisite/Credit: SSc8: Light Pollution Reduction Primary Rating System: New Construction v2009 Ruling All instances in the credit language of "LEED project boundary" or
LEED CI new tenant new registration required?
posted by Summer Gorder on
We are dealing with a certified LEED CI space, and the tenant that registered for and was awarded the certification is moving form the building.
Best energy modeling software
posted by W. Edward Locke, CSI-CIAQP-M.SAME on
Receiving conflicting reports about best most accurate energy modeling software.
Elevators - Energy Consumption - Sources
posted by Marcio Alberto Casado Pereira on
Hi, Is there any kind of consideration in order to estimate Elevators Energy Consumption, manuals, specific Leed procedure or so? Thanks in advance.
LEED-EBOM stress test
posted by Tristan Roberts on
Hi Rodney, LEEDuser came up with a guide we called the LEED-EBOM stress test precisely to help professionals in your situation begin to evaluate and fo