posted by Pat Thomas on
We project 90+% of the credits will cost more to implement in LEED 2012 than the current cost in LEED 2009 and that is not including additional design team fees or LEED documentation.
LEED NPD c6 and SLLc1
posted by Ilana Judah on
Hello, I am working on a 1/2 block Neighborhood Development located within Manhattan.
Min Energy Peformance- 75 Energy Star Rating for EB O&M
posted by Chris Munn on
The draft is proposing making the prerequisite for your Energy Star rating to be a minimum of 75. That is a 6 point jump from the previous requirement of a 69.
Fixture and fitting efficiency policy
posted by Chris Munn on
The draft states that the fixture and fitting replacement and retrofit policy must specify that “all newly installed toilets, urinals, lavatory faucets and showerheads must be WaterSense labeled fo
Responsible Extraction of Raw Materials
posted by Tom Lent on
This is a very important move for LEED - expanding the scope of attention on extraction from the previous focus only on wood to other biobased and mined materials as well.
Integrative Process Prerequisite
posted by Melissa Wrolstad on
Why is this prerequisite only for Healthcare?
NPD P3: Extra non-motorized connectivity
posted by Daniel Costantino on
Hello all, After several positive experiences on this forum, I return with another question. I am working on a project with internal streets.
FSC Wood is good, but NOT the ONLY one!
posted by Ward Miller on
The battle in the U.S.
A credit that's not in a category?
posted by Nadav Malin on
Is anyone else concerned about the structure of this draft, in that the Integrative Process credit is floating off by itself, outside of any category?
Public Metering/Autocontrol Lavatory Faucet – Gallons per Cycle
posted by Jeremy Cressman on
It appears that the metering faucet calculation providing a Gallons per Cycle option for flow rate has been removed from LEED 2012 Water efficiency prerequisite and Indoor water use calculation. I