Hello, I am working on a 1/2 block Neighborhood Development located within Manhattan. Because of the existing Manhattan grid structure (long blocks), the project is unable to achieve any points under NPD c6 and only 2 of the 5 connectivity points for SLLc1. Do you know if there any sort of exemption/consideration for existing city grid networks?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Eliot Allen
LEED AP-ND, PrincipalCriterion Planners
LEEDuser Expert
303 thumbs up
March 21, 2012 - 4:53 pm
Ilana, there haven't been any CIRs issued to date that address the issue you're raising, but that's an avenue (bad pun) to pursue.
Eliot
Ilana Judah
28 thumbs up
March 21, 2012 - 5:38 pm
Thanks Eliot. Along similar lines, do you know if schools which take up a full city block or a portion of a block would count as excludable land area? I know that school campuses are allowed to be excluded, but can school and/or church facilities be excluded? Is there a certain minimum size?
Eliot Allen
LEED AP-ND, PrincipalCriterion Planners
LEEDuser Expert
303 thumbs up
March 21, 2012 - 5:57 pm
Excluding churches would be a stretch; that's never happened. But school property is regularly excluded as a 'public facility campus.' There's no minimim size.
Eric Orozco
Urban Designer, LEED AP NDNeighboring Concepts, PLLC
38 thumbs up
March 21, 2012 - 6:32 pm
Interesting. On a related note, if a parcel dedicated for school use in the project is bordering the Project Boundary, must a right-of-way connection be developed every 400 feet at the boundary along the school site? Does NPDc6 assume that 5-15 acre school sites have right-of-way connections through these sites? If so, can a pedestrian connection developed by the school within school property count as "right-of-way"?
Eliot Allen
LEED AP-ND, PrincipalCriterion Planners
LEEDuser Expert
303 thumbs up
March 21, 2012 - 6:54 pm
Eric, the NPDc6 requirement for ROW through-connections or terminations every 400 ft on the project boundary is blind to the land-uses that occupy property between the ROWs, including schools. A non-motorized pedestrian connection is explicitly allowed to meet the 400 ft interval, but the ped route has to be located in a dedicated ROW. So just constructing a pathway on school property wouldn't qualify. But you could try a CIR if you think there are special circumstances.
Eliot