Hello, I am working on a 1/2 block Neighborhood Development located within Manhattan. Because of the existing Manhattan grid structure (long blocks), the project is unable to achieve any points under NPD c6 and only 2 of the 5 connectivity points for SLLc1. Do you know if there any sort of exemption/consideration for existing city grid networks?