Forum quick links
GHG emissions Factors for LEED v4 - 2024 Update
NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
Is there a required source to obtain the GHG Emission Factors (such as Energy Star) to use for the calculations?
Monitoring Systems for Commercial Interiors projects
Pilot-Credits LTpc134:Advanced Transportation Monitoring Systemsposted by Jose Antonio Kovacevic on
Hi everyone, we are searching for pilots credits for a corporative office that wants to pursues LEED ID+C certification in a certified LEED BD+C Core and Shell Gold project.
"Less than" VOC content instead of solid VOC value
CI-v4 EQc2:Low emitting materialsposted by Edgar Arevalo on
I don't know if anyone has faced this dilemma before, but for me I'm sick and tired of it. Certain manufacturer sites have products with a "less than or <" VOC content instead of a solid n
Bird Collision Gradient Frit on glass panel
NC-v4 INc1:Innovationposted by Thomas Lagarde on
Hello all ! As the title might suggest.
How would you go at calculating the Bird Safety Factor for panels that have a gradient frit pattern on it ?
LEED Online submission language
NC-v4 IPc1:Integrative processposted by Marcelo Alencar Pereira on
Option 2 - Carbon dioxide monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered.
Fixed links in the credit form + info for airport projects pursuing IPpc98
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Emily Piette on
Not sure if posting in this forum is necessary for submitting this credit, but I felt I had some useful takeaways/feedback after completing the pilot credit survey and wanted to shar
VOC emission test performed on a different product in the same product line
CS-v4.1 EQc2:Low-Emitting Materialsposted by Erika Herrera on
Hi LEED experts,
Office kitchen to be considered as regularly occupied space for Daylight Analysis
NC-v4 EQc7:Daylightposted by Rajat Kumar on
We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don
BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENT
Schools-NC-v4.1 LTc5:Access to Quality Transitposted by Amal Venugopal on
The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1.