Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Entryway systems for delivery

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Christine Recke  on 

Hi everyone,

we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation. 

3
Tue May 5, 2020, 7:02 pm

Previously Developed - Golf course

NC-v4 LTc2:Sensitive land protection
posted by  PJ Ryan  on 

Hi,

I'm working on the LEED certification of a development located on land formerly used as a golf course.

Would this be considerd to be 'previously developed'?

1
Wed May 6, 2020, 3:35 pm

Gross floor area modification

CS-2009 PIf2:Project Summary Details
posted by  Silvia Ruiz  on 

Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue May 5, 2020, 4:59 pm

10% exclusion

EBOM-2009 SSc7.2:Heat Island Reduction—Roof
posted by  Varun Chandra  on 

We have a project with an office tower (white TPO) and a detached 2-story annex (mod-bit BUR). The annex is 7% of the total building area.

1
Tue May 26, 2020, 11:10 pm

EA Advanced Energy Metering

NC-v4 EAc3:Advanced energy metering
posted by  Donald Green  on 

I would like to clarify how a small project can comply with advanced energy metering.

4
Tue May 5, 2020, 3:43 pm
1
Mon May 25, 2020, 1:13 am

Energy Data of buildins in Saoudi Arabia

NC-v4.1 EAp3:Building-Level Energy Metering
posted by  Guillaume Rose  on 

Hi everyone, 

I would like to know if anyone knows of a site that provides measured consumption data for leed certified buildings in Saudi Arabia?

Thank you for your help,

1
Mon May 18, 2020, 2:41 pm

WS Label Required for Aerators

NC-v4 WEc2:Indoor water use reduction
posted by  RDK E&S  on 

We received a LEED comment on a residential project where we installed flow restrictors to reduce the faucet flow rate to 0.5 gpm.

4
Default Avatar
Chief Sustainability Strategist
Glumac
LEEDuser Premium Member
0 thumbs up
Tue May 5, 2020, 1:29 pm

Achieving credit ( 1 Innovation point?) for having a Green Cleaning Policy with a NC K-12 School Project

NC-v4.1 INc1:Innovation
posted by  Michael McDonald  on 

A few years back on NC Projects Achools were able to achieve 1 Innovation Point on NC Projects by Implementing a Green Cleaning Policy.

0