Forum quick links
Interior cross contamination prevention out of scope-CI
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Casey Cullen-Woods on
I am working on a commercial interior fit out project that would like to pursue this credit. The base building has entryway systems and MERV filtration on outdoor handling units.
DES Path 1: ASHRAE 90.1 Points Cap
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
Is there a points cap when using DES Whole Building Simulation Path 1 in LEED v4? This is stated in the v2009 credit language but have not found it anywhere in v4.
Baseline of existing building with major renovation
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mike Mentzos on
According to ASHRAE 90.1-2010 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect
No more than 25% of the building’s cool-wall area facing away from the equator
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Aleksandra Prawda on
Hi all,
Baseline Envelope
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mike Mentzos on
I would like to confirm that in the case of Major Renovation the baseline is the same as New Construction
LEED / WELL Crosswalk
Pilot-Credits EQpc105:Lead Risk Reductionposted by Dave Hubka on
Our project is pursuing LEED/WELL concurrently, as such we used the LEED/WELL crosswalk guidance to demonstrate compliance with this pilot credit.
Letter from owner committing to sharing water usage data
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Mary Holland on
What language is LEED looking for in this letter?
Requirements for visitors counting
Pilot-Credits LTpc134:Advanced Transportation Monitoring Systemsposted by Adriana Hansen on
Hi everyone,
Regarding visitors counting, is it necessary to count visitors who only stay in lobbies and outside areas, but does not entry the building?
Does it have to be EXISTING infrastructure?
ND-Plan-v4 SLLp1:Smart locationposted by Jeanne Davidson on
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert.
Total annual energy consumption in complex railway station in India
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
The railway station has one entry building which is connecting by foot over bridge with platforms.