Electrical service requirement for dual port Level 2 chargers

CS-v4.1 LTc8:Electric Vehicles
posted by  Natalie Terrill  on 

The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space.

1
Tue Jan 31, 2023, 3:56 pm

Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Stephanie Graham  on 

Under Credit-Specific Documentation it says, "Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials

3
Default Avatar
Sustainability Consultant
Arup
LEEDuser Basic Member
2 thumbs up
Fri Apr 8, 2022, 4:05 pm

Lighting control for hotel lobby, bar, restaurant

Hospitality-NC-v4 EQc6:Interior lighting
posted by  Giuseppina Amorusi  on 

Good morning

I have a question relating lighting control in a hotel building.

0
1
Tue Apr 12, 2022, 1:42 pm

Furniture and Medical Furnishing (product sourced -160Km)

Healthcare-v4.1 MRc7:Furniture and Medical Furnishings
posted by  Maria Kordjamshidi  on 

I am woundring if the product sourced is not in 160 km of the project, no point will be assigned to the project from MRC7? 

0

Fire alarm cables (Public Address system) in the hospitals

Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copper
posted by  Najam Us Saqib  on 

Fire alarm cables are same like electrical cables, however, its function is different.

1
Tue Oct 22, 2024, 3:52 pm

Contractor is not able to comply with Cx Specifications

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Timothy Ian Middleton  on 

We have a project where the contractor is not able to comply with the Cx Specifications and Testing Procedures provided by the CxA.

3
Thu Apr 7, 2022, 9:51 am
1
Wed Jun 14, 2023, 3:24 pm