Rainwater Harvesting Tank Calculations
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Erin Holdenried on
Has anyone found a good spreadsheet/website that calculates the approximate size of a rainwater tank needed for a given roof area and water usage?
v4.1 and v4 for the pilot credit have the same language (Pilot language is not updated for v4.1)
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by Grace Friedhoff on
The Pilot Credit EQpc117 - Quality views in nonregularly occupied spaces has the exact same LEED guidance language in both the v4 and v4.1 guidance in the LEED guidance library online.
Kitchen Equipment Baseline Energy Consumption Calculation
CI-v4.1 EAp2:Minimum Energy Performanceposted by Timothy Howarth on
I have calculated the energy consumption from kitchen equipment on my project using the schedule of appliances from the kithcen designer, the manufacturer data for peak equipment load or daily
EPA LEED CHP Calculator?
NC-v4 EAp2:Minimum energy performanceposted by Erin Holdenried on
Has anybody used the EPA LEED CHP Calculator on a LEED project? As the the name suggests, it was made specifically for LEED projects (though it states for early assessment only). W
View Factor 3
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by James Bell on
I have seen several references to View Factor 3 and cannot find any definition.
Registration to Pilot-Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Vassil Vassilev on
Greetings,
There is a problem when attempting for a Registration to this Pilot-Credit.
Distance to the access point within the limit or not
Healthcare-v4 SSc7:Places of respiteposted by Priscillia Champagne on
Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital.
Bicycle Facilities - Shower requirement
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.
Fundamental Commissioning of On-Site Solar Array
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Williams on
I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.
Sound Rating Method - can these vary per space types?
NC-v4 EQc9:Acoustic performanceposted by Iris Meeker on
For HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA,
dBC, RC(N)), or can these vary by individual space or by space type?