Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Rainwater Harvesting Tank Calculations

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Erin Holdenried  on 

Has anyone found a good spreadsheet/website that calculates the approximate size of a rainwater tank needed for a given roof area and water usage?

4
Thu May 12, 2022, 7:31 pm

v4.1 and v4 for the pilot credit have the same language (Pilot language is not updated for v4.1)

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Grace Friedhoff  on 

The Pilot Credit EQpc117 - Quality views in nonregularly occupied spaces has the exact same LEED guidance language in both the v4 and v4.1 guidance in the LEED guidance library online.

0

Kitchen Equipment Baseline Energy Consumption Calculation

CI-v4.1 EAp2:Minimum Energy Performance
posted by  Timothy Howarth  on 

I have calculated the energy consumption from kitchen equipment on my project using the schedule of appliances from the kithcen designer, the manufacturer data for peak equipment load or daily

1
Wed Jun 29, 2022, 3:07 pm

EPA LEED CHP Calculator?

NC-v4 EAp2:Minimum energy performance
posted by  Erin Holdenried  on 

Has anybody used the EPA LEED CHP Calculator on a LEED project?  As the the name suggests, it was made specifically for LEED projects (though it states for early assessment only).  W

1
Wed Jun 29, 2022, 2:35 pm

View Factor 3

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  James Bell  on 

I have seen several references to View Factor 3 and cannot find any definition.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu May 12, 2022, 6:42 am

Registration to Pilot-Credit INpc155

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Vassil Vassilev  on 

Greetings,

There is a problem when attempting for a Registration to this Pilot-Credit.

1
Thu May 12, 2022, 12:46 pm

Distance to the access point within the limit or not

Healthcare-v4 SSc7:Places of respite
posted by  Priscillia Champagne  on 

Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital.

0

Bicycle Facilities - Shower requirement

NC-v4 LTc6:Bicycle facilities
posted by  akshaya bhaskar  on 

We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.

1
Wed May 11, 2022, 7:51 pm

Fundamental Commissioning of On-Site Solar Array

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rachel Williams  on 

I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed May 11, 2022, 6:17 pm

Sound Rating Method - can these vary per space types?

NC-v4 EQc9:Acoustic performance
posted by  Iris Meeker  on 

For HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA,
dBC, RC(N)), or can these vary by individual space or by space type?

0