Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Retail - commercial interiors

CI-2009 SSc3.3:Alternative transportation - parking availability
posted by  eileen hughes  on 

There is existing parking but no DESIGNATED parking will be provided for Tenant employees.

2
Wed Aug 10, 2011, 9:09 pm

Timing of Installation of Fixtures

CI-2009 WEp1:Water use reduction
posted by  Dax Ponce de Leon  on 

Do fixtures need to be installed prior to occupancy? Prior to project completion?

3
Wed Aug 10, 2011, 11:37 am

Maintenance Staff Training

EBOM-2009 WEc4:Cooling tower water management
posted by  David Hubka  on 

LEED User offers the following advice for projects that completely outsource their cooling tower management: "Unless cooling tower management is completely outsourced, staff training is required, e

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Aug 9, 2011, 8:53 pm

Improper Product Claims

NC-2009 MRc4:Recycled content
posted by  Eric Shamp  on 

I have sort of a minor ethical crisis: I'm reviewing the website of a not-to-be-named tile manufacturer who is claiming 40% MRc4 recycled content in their product, due to the reintroduction of scra

7
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Tue Aug 9, 2011, 4:18 pm

50% Furniture Used at Another One of Our Offices

CI-2009 MRc3.2:Materials reuse - furniture and furnishings
posted by  Reynaldo Castro  on 

We are moving about half of the existing furniture from our office to another one of our office locations to be used.

3
Senior Manager, Corporate Services
MEA & Associates Limited (Hong Kong)
LEEDuser Basic Member
62 thumbs up
Tue Aug 9, 2011, 1:02 pm

Qualification of CxA

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  James Chueh  on 

Quick question, can the contractor of building's BAS (for both the installation and manufacturer of DDC/control components) be designated to be the CxA?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Aug 8, 2011, 3:40 pm

What daylight modeling programs??

CI-2009 IEQc8.1:Daylight and views - daylight
posted by  Susan M. Kaplan  on 

We are trying to evaluate the best way of meeting this requirement through Option 1 - Simulation according to the latest (May 2011) Addenda changes (min. 10 fc on Sept.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 5, 2011, 9:04 pm

Hotel Passengers

NC-2009 WEp1:Water use reduction
posted by  Catalina A  on 

Are Hotel Passengers considered transients or residents?

3
Sustainability Manager
YR&G
LEEDuser Basic Member
151 thumbs up
Fri Aug 5, 2011, 5:46 am

Good or no?

EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiency
posted by  Elizabeth Crenshaw Hammitt   on 

The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a satisfactory

2
Wed Aug 3, 2011, 3:07 pm

Cx for Domestic HW to Point of Connection - Sink only

CI-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Harvard University Green Building Services  on 

We have a project where a sink was added as part of the scope and tied into existing cold and HW supply lines, with no alteration to any other part of the domestic HW system.

2
Director of Commissioning & Critical System
Edwards & Zuck
LEEDuser Basic Member
29 thumbs up
Wed Aug 3, 2011, 2:51 pm