Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy Star approach for multiple buildings

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Erin Holdenried  on 

I am working on a LEED project that was registered under LEED EB: O&M 2008 that is obtaining one LEED rating for the campus.

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Wed Jun 8, 2011, 3:15 pm

Chain of Custody - Final step

NC-2009 MRc7:Certified Wood
posted by  Roberto Meza  on 

Hello, I'm working in some projects in Latin America where it is pretty difficult to find FSC certified final products (i.e. chairs, desks, doors, etc).

4
Architect / Sustainability Strategist
Perkins+Will
LEEDuser Basic Member
161 thumbs up
Wed Jun 8, 2011, 2:40 pm

STC Rating - Classroom to In-Classroom Toilet for Kindergarten

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Rebecca Griffith  on 

Currently our walls from Kindergarten classrooms to in-classroom toilets are scheduled for an STC rating of 50, but will probably meet 52 with our specified foamed-in-place insulation in 8" CMU.

3
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Jun 7, 2011, 9:50 pm

VLT

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Diana Hernandez  on 

Hello, If the window looks like sandwich, a piece of glass( VLT1) , air gap, another piece of glass(VLT2) , how to define the VLT of that window?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Jun 7, 2011, 6:10 pm

Hotel Baseline

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Luis Miguel Diazgranados  on 

We recently started a Hotel project for certification. Since guests should be considered residents (according to the last post), should we use residential baselines for Room Fixtures?

4
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Jun 7, 2011, 5:39 pm

Credit Closing in July

Pilot-Credits PC23:Quality Views
posted by  Batya Metalitz  on 

This credit will be closing in July 2011, with the launch of the LEED 2012 2nd Public Comment period.

2
Fri Jun 3, 2011, 9:20 pm

Sustainable Sites Credit 4.3 Alternative fueling stations

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Christoph Dewald  on 

Dear all, at the moment we are working on an office building. In the building there are between 100 and 200 parking spaces.

2
Fri Jun 3, 2011, 10:32 am

Controllability of Systems- Lighting Documentation

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Robert Longo, AIA, LEED AP  on 

How do I go about providing documentation to meet this credit. I am working on a fit out project for a new office.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue May 31, 2011, 11:11 pm

EAp2 Section 1.4 tables.xls

CS-2009 EAp2:Minimum Energy Performance
posted by  Yu Wang  on 

I am in need of help with EAp2 Section 1.4 tables.xls. This project is for new construction. 1. What means “Semi-conditioned”?

5
Mechanical Engineer
SCHOLZE Consulting GmbH
LEEDuser Basic Member
10 thumbs up
Tue May 31, 2011, 4:56 pm

Mechanical Equipment - Alternative compliance path

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Marcio Alberto Casado Pereira  on 

We are currently working on a project wich the HVAC system selected was the split highwall, and there are 3 evaporation machines inside each classroom.

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Mon May 30, 2011, 2:16 pm