Forum quick links
Energy Star approach for multiple buildings
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Erin Holdenried on
I am working on a LEED project that was registered under LEED EB: O&M 2008 that is obtaining one LEED rating for the campus.
Chain of Custody - Final step
NC-2009 MRc7:Certified Woodposted by Roberto Meza on
Hello, I'm working in some projects in Latin America where it is pretty difficult to find FSC certified final products (i.e. chairs, desks, doors, etc).
STC Rating - Classroom to In-Classroom Toilet for Kindergarten
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Rebecca Griffith on
Currently our walls from Kindergarten classrooms to in-classroom toilets are scheduled for an STC rating of 50, but will probably meet 52 with our specified foamed-in-place insulation in 8" CMU.
VLT
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Diana Hernandez on
Hello, If the window looks like sandwich, a piece of glass( VLT1) , air gap, another piece of glass(VLT2) , how to define the VLT of that window?
Hotel Baseline
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Luis Miguel Diazgranados on
We recently started a Hotel project for certification. Since guests should be considered residents (according to the last post), should we use residential baselines for Room Fixtures?
Credit Closing in July
Pilot-Credits PC23:Quality Viewsposted by Batya Metalitz on
This credit will be closing in July 2011, with the launch of the LEED 2012 2nd Public Comment period.
Sustainable Sites Credit 4.3 Alternative fueling stations
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Christoph Dewald on
Dear all, at the moment we are working on an office building. In the building there are between 100 and 200 parking spaces.
Controllability of Systems- Lighting Documentation
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Robert Longo, AIA, LEED AP on
How do I go about providing documentation to meet this credit. I am working on a fit out project for a new office.
EAp2 Section 1.4 tables.xls
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am in need of help with EAp2 Section 1.4 tables.xls. This project is for new construction. 1. What means “Semi-conditioned”?
Mechanical Equipment - Alternative compliance path
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Marcio Alberto Casado Pereira on
We are currently working on a project wich the HVAC system selected was the split highwall, and there are 3 evaporation machines inside each classroom.