Supplemental Daylight / Views Calculation Spreadsheet ERROR

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lindsay Duncan  on 

I downloaded the spreadsheet from LEED online today and have encountered problems. I've been able to input data but I'm not able to add rows to the spreadsheet.

2
Wed Jun 15, 2011, 3:28 pm

FSC CoC Certification Requirement (Vendors and Contractors)

CI-2009 MRc7:Certified Wood
posted by  Piyush Varma  on 

We are procuring FSC wood from a vendor, who in turn is going to procure the FSC certified products from a European vendor.

2
Chief Sustainability Officer - LEED Green Associate
Complete Millwork Services
LEEDuser Basic Member
108 thumbs up
Wed Jun 15, 2011, 6:09 am

Management Office FTE for Residential Project

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  William Weaver  on 

I think I know the answer to this already, but I just wanted to throw it out there for confirmation. We're working on a 60 unit multi-family affordable housing project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jun 14, 2011, 5:48 pm

Deviation from Default TSS Removal Efficiency

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Richard Gifaldi (Team Leader)  on 

I am working on a project in Germany that is using multiple buffer strips to remove TSS from runoff before it reaches a small drainage channel.

3
Fri Jun 10, 2011, 7:38 pm

Help with Documentation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Maya Karkour  on 

Dear all, 1) Thanks to LEED User for uploading sample documentation. This was very helpful. 2) the M&E working on the project would like to demonstrate compliance using a software program.

5
Default Avatar
Mechanical Engineer, LEED AP
GMEP Engineering
LEEDuser Basic Member
4 thumbs up
Thu Jun 9, 2011, 6:35 pm

safe, all-weather route??

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Christine Teichert  on 

what exactly constitutes a safe, all-weather route between the building entry and the network?

3
Default Avatar
Operations Manager
Abel Design Group
LEEDuser Basic Member
14 thumbs up
Thu Jun 9, 2011, 4:57 pm

Just one shower, and it won't be used for showering

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maura Adams  on 

Our building has 1 shower that will be used primarily for occasional cleaning of stuff like muddy rubber boots... it's adjacent to an ecology lab.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jun 9, 2011, 3:06 am

Are the restrooms private or public in an Office Building?

CS-2009 WEp1:Water Use Reduction
posted by  marisol cano  on 

Hello. We are doing a C&S certification for an office building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jun 8, 2011, 7:56 pm

MRc7 Documentation

NC-2009 MRc7:Certified Wood
posted by  Maura Adams  on 

I am confused about documentation requirements. The template states that vendor invoices are required on a line item basis... but if they're line items, they're not the original invoices.

11
Environmental Stewardship Manager
LEEDuser Basic Member
114 thumbs up
Wed Jun 8, 2011, 7:45 pm

Doors w/ FSC veneer and recycled (wood) core

NC-2009 MRc7:Certified Wood
posted by  Michael Miller  on 

As mentioned in a couple of other comments, the July, 2010, addenda revised the Calculations paragraph to include a clarification that "a product that includes multiple wood components, like a door

3