Forum quick links
Supplemental Daylight / Views Calculation Spreadsheet ERROR
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lindsay Duncan on
I downloaded the spreadsheet from LEED online today and have encountered problems. I've been able to input data but I'm not able to add rows to the spreadsheet.
FSC CoC Certification Requirement (Vendors and Contractors)
CI-2009 MRc7:Certified Woodposted by Piyush Varma on
We are procuring FSC wood from a vendor, who in turn is going to procure the FSC certified products from a European vendor.
Management Office FTE for Residential Project
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by William Weaver on
I think I know the answer to this already, but I just wanted to throw it out there for confirmation. We're working on a 60 unit multi-family affordable housing project.
Deviation from Default TSS Removal Efficiency
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Richard Gifaldi (Team Leader) on
I am working on a project in Germany that is using multiple buffer strips to remove TSS from runoff before it reaches a small drainage channel.
Help with Documentation
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Maya Karkour on
Dear all, 1) Thanks to LEED User for uploading sample documentation. This was very helpful. 2) the M&E working on the project would like to demonstrate compliance using a software program.
safe, all-weather route??
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Christine Teichert on
what exactly constitutes a safe, all-weather route between the building entry and the network?
Just one shower, and it won't be used for showering
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maura Adams on
Our building has 1 shower that will be used primarily for occasional cleaning of stuff like muddy rubber boots... it's adjacent to an ecology lab.
Are the restrooms private or public in an Office Building?
CS-2009 WEp1:Water Use Reductionposted by marisol cano on
Hello. We are doing a C&S certification for an office building.
MRc7 Documentation
NC-2009 MRc7:Certified Woodposted by Maura Adams on
I am confused about documentation requirements. The template states that vendor invoices are required on a line item basis... but if they're line items, they're not the original invoices.
Doors w/ FSC veneer and recycled (wood) core
NC-2009 MRc7:Certified Woodposted by Michael Miller on
As mentioned in a couple of other comments, the July, 2010, addenda revised the Calculations paragraph to include a clarification that "a product that includes multiple wood components, like a door